My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ORANGE COUNTY FIRE AUTHORITY - 2013 CDBG
Clerk
>
Contracts / Agreements
>
O
>
ORANGE COUNTY FIRE AUTHORITY (OCFA)
>
ORANGE COUNTY FIRE AUTHORITY - 2013 CDBG
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2017 9:46:50 AM
Creation date
1/23/2014 11:45:50 AM
Metadata
Fields
Template:
Contracts
Company Name
ORANGE COUNTY FIRE AUTHORITY (OCFA)
Contract #
A-2013-173
Agency
COMMUNITY DEVELOPMENT
Council Approval Date
11/18/2013
Expiration Date
12/31/2014
Destruction Year
2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
June 17, 2013 <br />Page 6 <br />(2) Remodel kitchen <br />(3) Remodel crew bathroom <br />Justification: (1) The station is 47 years old. Fire fighters are housed in a single dormitory <br />room that is inappropriate for mixed gender assignment. Crew does not <br />have adequate facility to store clothing and personal items. The common <br />sleeping arrangement provides no privacy and makes quality rest difficult, <br />Installation of privacy cubicles with doors and uniform lockers will bring <br />the space into compliance with OCFA habitability standards and <br />facilitate mixed gender use. General improvement of the space attending <br />the cubicles will improve the quality of life for the crew. <br />(2) The station kitchen has exceeded reasonable service life. All kitchen <br />systems are old, many broken and difficult to maintain in safe, sanitary, <br />serviceable conditions. The space does not support the need of station <br />personnel and does not meet OCFA standards for crew kitchens. The <br />attached photographs illustrate the problematic issues. <br />(3) The crew bathroom has exceeded reasonable service life. All systems <br />and fixtures are old, marginally serviceable and difficult to maintain in <br />safe, sanitary, serviceable condition. The attached photographs illustrate <br />the problem. <br />Estimated Budget: (1) Dormitory Privacy $25,000 <br />(2) Remodel Kitchen $75,000 <br />(3) Remodel Crew Bathroom $50,000 <br />Total: $150,000* <br />Scope of (1) Demolition of the current interior space and installation of new flooring, <br />Work: replacement of overhead lighting, new window covering, procurement <br />and installation of pre- fabricated cubicles with privacy door, <br />procurement and installation of uniform and equipment locker, paint and <br />finish. <br />(2) Demolition of the existing kitchen space. Procurement and installation of <br />new flooring, lighting systems, lower and upper cabinets, installation of <br />SS counter system with integral single large sink and disposal systems, <br />replacement of faucets and fixtures, upgrade of electrical, replacement of <br />dishwasher, range with ventilation and refrigerators, painting and finish. <br />(3) Demolition of existing bathroom. Installation of new flooring, overhead <br />lighting, exhaust ventilation, cabinets, shelving, counter, sink, and <br />fixtures. Replacement of privacy showers and fixtures and painting and <br />finish. <br />*Estimated budget does not include roof systems bid: <br />Fair I Clay Tile 1 8,800 13 to 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.