Laserfiche WebLink
June 17, 2013 <br />Page 12 <br />Project: (1) Replace roof <br />(2) Remodel Crew Bathroom <br />Justification: (1) The station is 51 years old and nearly all of the major building systems <br />exceed economical service life. The roof is 45 years old. Numerous <br />repairs and chronic failure is beyond economical repair. Roof <br />failure /leaks pose a risk for additional structural damage and the <br />introduction of mold into the station. <br />(2) The crew bathroom exceeds reasonable service life. It is difficult to <br />maintain in a sanitary, service condition. It does not meet OCFA <br />standards for station habitability. See attached photographs. <br />Estimated Budget: 1) Replace Roof $40,000 <br />(2) Remodel Crew Bathroom $50,000 <br />Total: $90,000 <br />Scope of (1) Tear - off/removal of the existing roof and replacement with a cementious <br />Work: tile roofing systbn. <br />(2) Demolition of existing bathroom. Installation of replacement flooring, <br />overhead lighting, exhaust ventilation, cabinets, shelving, counter, sink, <br />and fixtures. Installation of privacy showers and fixtures, painting and <br />finish. <br />See photos on the next page. <br />