My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ORANGE COUNTY FIRE AUTHORITY - 2013 CDBG
Clerk
>
Contracts / Agreements
>
O
>
ORANGE COUNTY FIRE AUTHORITY (OCFA)
>
ORANGE COUNTY FIRE AUTHORITY - 2013 CDBG
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2017 9:46:50 AM
Creation date
1/23/2014 11:45:50 AM
Metadata
Fields
Template:
Contracts
Company Name
ORANGE COUNTY FIRE AUTHORITY (OCFA)
Contract #
A-2013-173
Agency
COMMUNITY DEVELOPMENT
Council Approval Date
11/18/2013
Expiration Date
12/31/2014
Destruction Year
2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
June 17, 2013 <br />Page 26 <br />(2) Replace roof <br />(3) Remodel crew bathroom <br />Justification: (1) The station is 33 years old. Firefighters are housed in a single dormitory <br />room that is inappropriate for mixed gender assignment. Installation of <br />privacy cubicles with doors and uniform lockers will bring the space into <br />compliance with OCFA habitability standards. <br />(2) The station roof is original, over thirty years old, it is in poor condition. <br />It fails continuously and cannot be economically repaired. <br />(3) The crew bathroom has exceeded reasonable service life and is <br />inappropriate for mix gender assignment. See attached photographs. <br />Estimated Budget: (1) Dormitory Privacy $25,000 <br />(2) Replace roof $44,000 <br />(3) Remodel Crew Bathroom $60,000 <br />Total: $129,000 <br />Scope of (1) Demolition of current interior space and installation of new flooring, <br />Work: replacement of overhead lighting, new window covering, procurement <br />and installation of pre-fabricated cubicles with privacy door, <br />procurement and installation of uniform and equipment locker. <br />(2) Demolition/tear -off of the existing gravel built -up roof and replacement <br />of 6,400 square feet of modified bitumen roof. <br />(3) Demolition of existing space. Procurement and installation of <br />replacement flooring, overhead lighting, exhaust ventilation, cabinets, <br />shelving, counter, sink, and fixtures. Replacement showers and fixtures <br />and painting and finish as required. <br />See photos on the next page. <br />
The URL can be used to link to this page
Your browser does not support the video tag.