My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ORANGE COUNTY FIRE AUTHORITY - 2013 CDBG
Clerk
>
Contracts / Agreements
>
O
>
ORANGE COUNTY FIRE AUTHORITY (OCFA)
>
ORANGE COUNTY FIRE AUTHORITY - 2013 CDBG
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2017 9:46:50 AM
Creation date
1/23/2014 11:45:50 AM
Metadata
Fields
Template:
Contracts
Company Name
ORANGE COUNTY FIRE AUTHORITY (OCFA)
Contract #
A-2013-173
Agency
COMMUNITY DEVELOPMENT
Council Approval Date
11/18/2013
Expiration Date
12/31/2014
Destruction Year
2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
June 17; 2013 <br />Page 31 <br />Station Fire id 6,076 <br />Project: (1) Dormitory Privacy <br />(2) Replace flooring <br />(3) Replace Roof <br />Justification: (1) The station is 54 years old. Firefighters are housed in a single dormitory <br />room that is inappropriate for mixed gender assignment. histallation of <br />privacy cubicles with doors and uniform lockers will bring the space into <br />compliance with OCFA habitability standards. <br />(2) The current flooring is a mix of original and added carpet. The entire <br />interior is beyond serviceability and requires replacement. <br />(3) The station roof is a replacement foam roof system approaching the end <br />of its serviceable life. It fails frequently. Continued repair will not <br />provide added life. <br />Estimated Budget: (1) Dormitory Privacy $25,000 <br />(2) Replace flooring $25,000 <br />(3) Replace roof $25,000 <br />Total: $75,000 <br />Scope of (1) Demolition of current interior space and installation of new flooring, <br />Work: replacement of overhead lighting, new window covering, procurement <br />and installation of pre- fabricated cubicles with privacy door, <br />procurement and installation of uniform and equipment locker. <br />(2) Demolition/removal of all current floor covering, repair of flooring base <br />and installation of 18X18 composite vinyl tile, trim, base molding, finish <br />and paint as required. <br />(3) Demolition/tear -off of existing roof, repair as required, and addition of a <br />cricket drain and application of a buildup modified bitumen roof system. <br />Finish as required and installation. <br />See photos on the next page. <br />
The URL can be used to link to this page
Your browser does not support the video tag.