Laserfiche WebLink
June 17, 2013 <br />Page 34 <br />(2) Remodel crew bathroom <br />(3) Replace roof <br />Justification: (1) The station is 33 years old. Firefighters are housed in a single dormitory <br />room that is inappropriate for mixed gender assignment. Installation of <br />privacy cubicles with doors and uniform lockers will bring the space into <br />compliance with OCFA habitability standards. <br />(2) The crew bathroom has exceeded service life and is inappropriate for mix <br />gender use. See attached photographs. <br />(3) The existing roof is more than 25 years old and has reached serviceable <br />life. It fails continuously and is not economical to repair. Frequent <br />leak/failure risks damage to internal building structures and spaces. <br />Estimated Budget: (1) Dormitory Privacy $25,000 <br />(2) Remodel crew bathroom $30,000 <br />(3) Replace roof $33,000 <br />Total: $88,000 <br />Scope of (1) Demolition of current interior space and installation of new flooring, <br />Work: replacement of overhead lighting, new window covering, procurement <br />and installation of pre- fabricated cubicles with privacy door, <br />procurement and installation of uniform and equipment locker. <br />(2) Demolition of existing space. Installation of replacement flooring, <br />overhead lighting, exhaust ventilation, cabinets, shelving, counter, sink, <br />and fixtures. Replacement showers and fixtures and painting and finish <br />as required. <br />(3) Demolition/tear -off of the existing shingle roof, substrate repair as <br />required and replacement with a modified bitumen roof system finish as <br />required. <br />See photos on the next page. <br />