Laserfiche WebLink
June 17, 2013 <br />Page 38 <br />(2) Replace flooring <br />Justification: (1) The station is 25 years old. The shower systems in each crew bathroom <br />are failing, leaking through shower wall and the shower floor pan. <br />Leaking is causing damage to the building structure. <br />(2) Carpet throughout the station is badly wom, torn and failing. It has <br />exceeded service life. The carpet chronically separates at seams and <br />loses adhesion to the floor, and has become a hazard. <br />Estimated Budget: (1) Upgrade /repair showers $50,000 <br />(2) Replace flooring $30,000 <br />Total: $80,000 <br />Scope of (1) Demolition of existing show stalls, repair as required, installation of <br />Work: shower walls, tile, hot mop, replace pan tile, grout paint and finish as <br />required. <br />(2) Demolition/removal of all current floor covering, repair of flooring base <br />and installation of 18X18 composite vinyl tile, trim, base molding, finish <br />and paint as required. <br />See photos on the next page. <br />