My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20131125_2013-29_1030SEuclidSt
Clerk
>
Resolutions
>
PLANNING COMMISION
>
2013
>
20131125_2013-29_1030SEuclidSt
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2014 10:27:41 AM
Creation date
1/24/2014 10:27:00 AM
Metadata
Fields
Template:
PBA
Doc Type
Resolution
Doc #
TTM13-06SN13-01
Date
11/25/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NOVEMBER 25, 2013 <br />PAGE 2 OF 2 <br />8. Provide details of the mailbox or "gang box" to be installed. Such box <br />shall be enclosed in a decorative pedestal to match architecturally with the <br />proposed buildings. <br />9. Paving at each driveway shall match the proposed walkway paving finish. <br />10. All utility meters and boxes shall be placed in vaults below grade. Any <br />above grade meter and /or box shall be reviewed by the Planning Division <br />Manager to ensure all options have been reviewed. <br />11. Solar panels shall be provided for each of the 17 homes. The final design <br />and application of the panels shall be subject to the review and approval <br />by staff. <br />12. Prior to submittal into Building Division Plan check submit for review and <br />approval a landscape plan Providing a landscape screen in the rear yard <br />of each lot. (Added by Planning Commission on 11- 25 -13) <br />Resolution No. 2013 -29 <br />Page 8 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.