My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
EXHIBIT 4-1_55A_BRISTOL WIDENING EIS-EIR
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
02/04/2014
>
EXHIBIT 4-1_55A_BRISTOL WIDENING EIS-EIR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2014 7:46:43 AM
Creation date
1/29/2014 3:20:49 PM
Metadata
Fields
Template:
City Clerk
Agency
Public Works
Item #
55A
Date
2/4/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
414
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Widening or reconstruction of the Bristol Street bridge is not expected to have <br />impacts on the minor biological features of Santiago Creek The wetland -- <br />features of Santiago Creek and the wetland features that formerly existed <br />on this creek have been previously destroyed when the meek was stavilized <br />and channelized. Activities during the construction phase of the bridge - <br />widening are not expected to impact adjacent or downstream wildlife values. <br />The greatest impact will be to the ornamental plants that exist on the road •- <br />shoulders adjacent to the bridge. At least three large blue gum trees on the r- <br />southwest shoulder, a large Italian stone pine on the northwest shoulder, and <br />one medium -sized sycamore tree on the southeast shoulder of the bridge will <br />have to be removed to accommodate the bridge and street widening. Their <br />removal is not expected to produce negative biological impacts. <br />ra <br />Mitigation Measures <br />1. Replacement of tree plantings will occur on those shoulders without �- <br />surviving trees. <br />2. Bridge widening design and construction will comply with applicable <br />requirements of the "nationwide permit" provisions pursuant to the <br />Federal Clean Water Act and with applicable requirements of a <br />Streambed Alteration Permit issued by the California Department of <br />Fish and Game. <br />F. WATER QUALITY M <br />Consequences <br />M <br />Construction of the preferred widening alternative would not directly affect the <br />quality of local groundwater or other water sources. Street construction <br />activities typically involve very shallow excavation, reaching maximum depths <br />of about one or two feet. Throughout the subject segment of Bristol Street <br />(except Santiago Creek), depths to groundwater are greater than five feet. <br />Within Santiago Creek, depth to groundwater is somewhat shallower, <br />especially during the rainy season, but the absence of any typical wetland <br />vegetation or wildlife indicate that depth to groundwater in the creek bed is <br />not shallow. Reconstruction of the Santiago Creek Bridge supports, if needed, <br />would be accomplished during dry months, thus minimizing any disturbance to <br />ground water. <br />If not controlled, sediments and urban run -offs occurring during street <br />widening activities could result in contaminants being added to downstream ' <br />waters, where the street drainage system ultimately flows. <br />N -6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.