My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
EXHIBIT 4-1_55A_BRISTOL WIDENING EIS-EIR
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
02/04/2014
>
EXHIBIT 4-1_55A_BRISTOL WIDENING EIS-EIR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2014 7:46:43 AM
Creation date
1/29/2014 3:20:49 PM
Metadata
Fields
Template:
City Clerk
Agency
Public Works
Item #
55A
Date
2/4/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
414
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
roadway. For this reason, the volume of traffic which Bristol Street can handle <br />efficiently will be decreased during the period of project construction- Since this <br />would result in an increase in travel time along Bristol Street, some motorists will <br />probably choose to take an alternative route when convenient. Access to <br />property fronting along Bristol Street will also be intermittently disrupted as work <br />progresses adjacent to individual parcels and temporarily blocks driveway access. <br />Provisions will be made for interim access whenever necessary. Since <br />construction of the project will be undertaken in phases, the disruption of <br />circulation along the roadway will be reduced since only certain segments of the <br />street would then be affected at any one tame. In order to enhance traffic flow <br />and minimize hazards, traffic control plans will be prepared prior to each step in <br />the construction process. <br />The disruption of traffic and restriction to access along Bristol Street during <br />project construction could affect the mobility and responsiveness of emergency <br />vehicles which commonly utiliae the street. The fire department has indicated <br />that Stations 1, 3, 4, S and 7 will be impacted during construction of the proposed <br />project since these stations typically utilize Bristol Street in route to as emergency <br />call. Similarly, police vehicles and ambulances commonly utilize Bristol Street <br />as a travel route in emergency situations and, as a result, will be adversely <br />impacted by any restrictions to travel caused by construction activities. Even <br />though movement may be hampered by construction activities, Bristol Street will <br />remain open to through traffic and access to property along the street will be <br />maintained. <br />Areas of controversy raised during public scoping meetings and as indicated by written <br />comments received from local citizens and other public agencies include the following: <br />A. Potential housing and business displacement and relocation benefits; <br />B. Disruption of through traffic and site access during construction and related <br />effects on local businesses and emergency response vehicles; <br />C. Procedure for determining the amount of compensation for owners of property <br />acquired for the expanded right -of -way; <br />D. Duration of the construction process and proposed methods of minimizing <br />nuisance emissions and noise during construction activities; <br />E. Long -term noise and air quality impacts; <br />F. Conversion of several intersecting streets to cul -de -sacs; and <br />CWC <br />
The URL can be used to link to this page
Your browser does not support the video tag.