My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
EXHIBIT 4-1_55A_BRISTOL WIDENING EIS-EIR
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
02/04/2014
>
EXHIBIT 4-1_55A_BRISTOL WIDENING EIS-EIR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2014 7:46:43 AM
Creation date
1/29/2014 3:20:49 PM
Metadata
Fields
Template:
City Clerk
Agency
Public Works
Item #
55A
Date
2/4/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
414
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
will contact the Underground Service Alert to notify the affected <br />utility/energy purveyors who can place their personnel at the excavation <br />site to assist in the location of underground facilities during the <br />exploratory digging immediately preceding excavation. in this manner, <br />the risk of line rupture to natural gas, petroleum, and sewer facilities, <br />which might release hazardous substances and odors into the air, can be <br />minimized. <br />18. Should any unidentified substances, odors, leaking underground tanks, <br />or other mysterious and potentially hazardous materials be encountered <br />during project construction, work in that area will be halted and the <br />Santa Ana Fire Department's Hazardous Materials Team will be <br />contacted to evaluate the materials and to define appropriate remedial <br />measures. <br />19. The removal. of any underground storage tanks will be in accordance <br />with all applicable regulations. For any service stations that will be <br />partially acquired or displaced, the City will request that the owners <br />remove the underground gasoline tanks prior to property acquisition. If <br />the owners do not remove the underground tanks, the City will include <br />the following statement in the right -of -way agreement: <br />"It is understood that the property being acquired in this <br />transaction may contain hazardous waste which must be <br />removed or otherwise treated, under state or federal law, <br />to protect the public health. If the hazardous waste is <br />found to exist on the property, the state may exercise its <br />right to bring an action, if necessary, to recover clean -up <br />costs from the grantors or any others who are ultimately <br />determined to have responsibility for the hazardous waste <br />condition of the property." <br />W. CONSUMPTION OF RENEWABLE AND NON- RENEWABLE RE- <br />SOURCE5 <br />Construction of the proposed project will involve the consumption of both <br />renewable and non - renewable resources. The materials utilized in the <br />construction of the widened roadway (i.e., sand, gravel, concrete, asphalt, <br />street fixtures) will, for all practical purposes, be permanently and irretrievably <br />committed to the project. Once the street improvements are complete, a <br />substantial amount of fuel will be consumed on a daily basis by vehicles <br />traveling along the roadway. The project would improve several circulation <br />performance characteristics inherent in determining fuel consumption by <br />automobiles. Since traffic volumes on Bristol Street are projected to increase <br />substantially, the proposed improvements should significantly improve <br />k-�- W -1-Wc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.