My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
EXHIBIT 4-1_55A_BRISTOL WIDENING EIS-EIR
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
02/04/2014
>
EXHIBIT 4-1_55A_BRISTOL WIDENING EIS-EIR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2014 7:46:43 AM
Creation date
1/29/2014 3:20:49 PM
Metadata
Fields
Template:
City Clerk
Agency
Public Works
Item #
55A
Date
2/4/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
414
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' t I DUIN A LN i <br />y ��: ��� . : � r ., r. r _ r�r r t • <br />Three widening alternatives were evaluated, each of which would provide a <br />new street right -o£ -way of 120 feet throughout the project limits, except for the <br />segment between Santiago Creek and Memory Lane, which would remain at <br />its_ present ioMoot right -of -way configuration. The proposed right -of -way <br />between Santiago Creek and Warner Avenue would provide three lanes. of <br />through traffic in both directions, plus a 14 -foot _wide, raised center median <br />that could be fully or partially landscaped, throughout the entire project <br />corridor. The remaining segment between Santiago Creek and Memory Lane <br />would be modified, without widening the street section, to provide three lanes <br />of through traffic, in each direction, divided by a 14 -foot wide, raised center <br />median, consistent with the street section along the rest of the corridor. <br />Additional right -turn only lanes and left -turn lanes would also be added to <br />several of the major intersections. Far -side bus turn -guts are proposed at the <br />following_ intersections: <br />Warner Avenue: northbound and southbound <br />Edinger Avenue: northbound and southbound <br />McFadden Avenue: northbound and southbound <br />First Street: northbound and southbound <br />Santa Ana Boulevard: eastbound <br />At several intersections, the right -of -way will need to be expanded somewhat <br />beyond the standard 120 feet to safely accommodate the additional right and <br />left turn lanes and the far side bus turn-outs. Similarly, additional right -of -way <br />will be needed along the east and west legs of several intersections to achieve <br />completely improved geometries in accordance with County and City standards <br />and to safely accommodate projected levels of traffic. 'l Ten east -west through <br />streets are proposed to become cul -de -sacs to further decrease congestion <br />along Bristol. Street (see Figure 20). The alternatives each envision widening <br />the existing 53 -foot wide bridge across Santiago Creek to accommodate six <br />through travel lanes. Please refer to Section IV.0 for a complete discussion <br />of the proposed traffic and circulation system improvements. <br />The alternative widening approaches evaluated consist of the three options <br />described below. It should be noted that each of these alternatives would <br />have the common features of maintaining the existing right -of -way and <br />centerline north of Santiago Creep and would also have a common design <br />between 17th Street and Santiago Creek. This common design feature would <br />I1 -1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.