My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
EXHIBIT 4-1_55A_BRISTOL WIDENING EIS-EIR
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
02/04/2014
>
EXHIBIT 4-1_55A_BRISTOL WIDENING EIS-EIR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2014 7:46:43 AM
Creation date
1/29/2014 3:20:49 PM
Metadata
Fields
Template:
City Clerk
Agency
Public Works
Item #
55A
Date
2/4/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
414
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAJOR CONBIUNITY FACILITIES IMPACTS <br />The cost for acquisition of land and improvements to provide the necessary <br />right -of -way is currently estimated at $50.3 million. Estimated construction <br />costs total $14.5 million. Although this cost is much higher than the other <br />alternatives, it is considered acceptable because the preferred alternative <br />preserves the major community facilities in this area and better meets the <br />Redevelopment Plan adopted by the City of Santa Ana. All alternatives avoid <br />4(f) sites. Any of the lower cost altematives would result in significant adverse <br />effects upon these community facilities and thereby result in unacceptable <br />disruption of the community character. In addition, the preferred alignment <br />involves a larger number of full-take parcels. These larger parcels can be <br />more effectively redeveloped than remnant parcels, in a comprehensive and <br />integrated manner, consistent with the design and development objectives for <br />the Bristol Corridor Redevelopment project, recently adopted by the Santa <br />Ana Redevelopment Agency. <br />This alternative would involve modifications to the existing transpor- <br />tation facility that would improve its traffic moving efficiency, without <br />acquiring additional right -of -way. Traffic signals throughout the subject <br />segment of Bristol Street are already synchronized. Insufficient <br />roadway width and right -of -way exists to enable restriping to add <br />additional through lanes or additional turn lanes at the intersections_ <br />The addition of bus stops was not suggested by the Orange County <br />Transit District, and without acquiring right -of -way to establish a bus <br />1I -20 <br />J <br />w <br />Preferred <br />Alt.1 <br />Alt.2 <br />Alt.3 <br />ternative <br />(both sides) <br />(east sided <br />wgst side) <br />Mater Dei <br />None <br />None <br />Substantial <br />None <br />High School <br />acquisition <br />Rancho Santiago <br />Minimal <br />Substantial <br />None <br />Substantial <br />Community College <br />acquisition on <br />acquisition <br />acquisition <br />the 17th street <br />frontage <br />Santiago Elementary <br />None <br />None <br />None <br />None <br />School [4(f)] <br />Bristol Street <br />None <br />Substantial <br />Substantial <br />None <br />Reservoir <br />acquisition <br />acquisition <br />The cost for acquisition of land and improvements to provide the necessary <br />right -of -way is currently estimated at $50.3 million. Estimated construction <br />costs total $14.5 million. Although this cost is much higher than the other <br />alternatives, it is considered acceptable because the preferred alternative <br />preserves the major community facilities in this area and better meets the <br />Redevelopment Plan adopted by the City of Santa Ana. All alternatives avoid <br />4(f) sites. Any of the lower cost altematives would result in significant adverse <br />effects upon these community facilities and thereby result in unacceptable <br />disruption of the community character. In addition, the preferred alignment <br />involves a larger number of full-take parcels. These larger parcels can be <br />more effectively redeveloped than remnant parcels, in a comprehensive and <br />integrated manner, consistent with the design and development objectives for <br />the Bristol Corridor Redevelopment project, recently adopted by the Santa <br />Ana Redevelopment Agency. <br />This alternative would involve modifications to the existing transpor- <br />tation facility that would improve its traffic moving efficiency, without <br />acquiring additional right -of -way. Traffic signals throughout the subject <br />segment of Bristol Street are already synchronized. Insufficient <br />roadway width and right -of -way exists to enable restriping to add <br />additional through lanes or additional turn lanes at the intersections_ <br />The addition of bus stops was not suggested by the Orange County <br />Transit District, and without acquiring right -of -way to establish a bus <br />1I -20 <br />J <br />w <br />
The URL can be used to link to this page
Your browser does not support the video tag.