My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
EXHIBIT 4-2_55A_BRISTOL WIDENING TECHNICAL STUDIES
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
02/04/2014
>
EXHIBIT 4-2_55A_BRISTOL WIDENING TECHNICAL STUDIES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2014 7:46:43 AM
Creation date
1/29/2014 3:24:59 PM
Metadata
Fields
Template:
City Clerk
Agency
Public Works
Item #
55A
Date
2/4/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14. Second line receptor exterior noise levels will exceed 67 <br />Leq with each alternative as detailed in the Appendix. <br />11. Second line receptor exterior *noise levels will approach 67 <br />Leq with each alternative as shown in the Appendix. <br />12. Noise measurements taken at two school, playgrounds and a <br />high school athletic area exceeded the FHWA design noise <br />levels for current conditions and will exceed the criteria <br />for future conditions with or without any of the proposed <br />f project alternatives. <br />Acoustic Mitigation Measures <br />The following mitigation measures have been recommended for in- <br />corporation in the project to minimize noise impactss <br />1. Construction activities will take place only on the hours <br />specified in the City of Santa Ana Noise Control Ordinance <br />to reduce noise impacts during more sensitive time periods. <br />2. All construction equipment, fixed or mobile, operated within <br />1000 feet of a dwelling shall be equipped with properly <br />operating and maintained muffler exhaust systems. <br />3. Stationary equipment shall be placed such that emitted noise <br />is directed away from sensitive noise receivers such as <br />residential areas. <br />4. Stockpiling and vehicle staging areas shall be located as <br />far as practical from occupied dwellings. <br />5. Every effort should be made to create the greatest distance <br />f between noise sources and receptors during construction. <br />b. The noisiest construction operations should be arranged to <br />■ occur together in the construction program to avoid contin- <br />uing periods of greater annoyance. <br />The following mitigation measures are suggested for consideration <br />and implementation if feasible. <br />{ <br />1. Any residential noise barriers that are removed in conjunc- <br />tion with the project should be replaced with barriers at <br />least 6 feet high. <br />2. For those dwellings on corner lots with access to cross <br />streets which experience exterior impacts, a six --foot block <br />wall could be constructed at the right -of --way to a point 25 <br />feet from the extension of the intersecting perpendicular <br />curb line of the cross street to reduce noise impacts. <br />�CXI] <br />
The URL can be used to link to this page
Your browser does not support the video tag.