My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Exhibit 4-3_55A_BRISTOL WIDENING TRAFFIC STUDY
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
02/04/2014
>
Exhibit 4-3_55A_BRISTOL WIDENING TRAFFIC STUDY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2014 7:46:43 AM
Creation date
1/29/2014 3:29:27 PM
Metadata
Fields
Template:
City Clerk
Agency
Public Works
Item #
55A
Date
2/4/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 OKS Associates <br />1 <br />2. Project Description <br />The proposed Bristol Street Specific Plan entails upgrading land uses along a corridor centered <br />around Bristol Street from Memory Lane to Warner Avenue in the City of Santa Ana. The <br />upgrading is predominantly comprised of developing parks along Bristol Street accompanied with <br />some new commercial and mixed -use redevelopment projects. The main concept of the Bristol <br />Street Specific Plan is to strengthen commercial nodes, repackage Specific Plan parcels and to <br />accentuate Bristol Street with trees and various landscaping. The focal point of this study is to <br />consider this Specific Plan along with the approved Bristol Street widening project to account <br />for the net change in traffic volume generated in comparison to the General Plan. <br />2.1 BRISTOL STREET WIDENING PROJECT <br />The proposed Bristol Street widening to a six -lane divided major arterial as submitted in the <br />final Environmental Impact Statement (EIS) has been previously approved for implementation. <br />Recommended improvements under the EIS are: <br />1. Provide a 100 foot wide roadway on a 120 foot wide right- of-way from the Santiago <br />s Creek to Warner Avenue. <br />2. Provide intersection lane configurations as shown on Figure 4 -1. <br />3. Prohibit U -turns and provide right -turn overlaps with left -turn phasing at the intersection <br />of Bristol Street with Memory Lane and 17th Street. <br />4. Provide protected left -turn phasing in all directions of the intersection along Bristol Street <br />at Memory Lane, 17th Street, First Street, Edinger Avenue and Warner Avenue_ Provide <br />f protected left -turn phasing on Bristol Street in the north -south direction at the Bishop <br />Street/Willits Street and the McFadden Avenue intersection. <br />5. Provide protected, left -turn phasing on Bristol Street in the north -south direction at the <br />Santa Clara Avenue, Washington Avenue, Civic Center Drive, 5th Street and Santa Ana <br />Boulevard intersections. <br />6. Widen the bridge over Santiago Creek to a 100 -foot right -of -way with three through lanes <br />in each direction. <br />7. Remove yellow school crosswalk markings on the north leg of Bristol Street at St. <br />Andrews Place and direct pedestrians to use the traffic signal at Glenwood Place to cross <br />_ Bristol Street. Reestablish safest route to school utilizing signalized intersection - <br />i <br />I28657.M223x0.Rpe 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.