My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Exhibit 4-3_55A_BRISTOL WIDENING TRAFFIC STUDY
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
02/04/2014
>
Exhibit 4-3_55A_BRISTOL WIDENING TRAFFIC STUDY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2014 7:46:43 AM
Creation date
1/29/2014 3:29:27 PM
Metadata
Fields
Template:
City Clerk
Agency
Public Works
Item #
55A
Date
2/4/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iR <br />DKS Associates <br />Table of Contents <br />EXECU'T`IVE SUMMARY <br />1. INTRODUCTION ............................................... <br />2. PROJECT DESCRIPTION .......... ............................... <br />21 Bristol Street Widening Project ............................... <br />2.2 Bristol Street Specific Plan .................................. <br />3. EXISTING CONDITIONS ......................................... <br />3.1 Major Street Characteristics ................................. <br />3.2 Midblock Capacity Analysis ................................. <br />3.3 Intersection Capacity Analysis ................................ <br />3.4 Bus Transit ............................................ <br />4. GENERAL PLAN CONDITION (YEAR 2006) WITH AND WITHOUT <br />WIDENING ...... . . . ... .... ....................... .. . . . ... <br />5. SPECIFIC PLAN IMPACT ......... ............................... <br />5.1 Trip Generation .. . . . .... ............................... . <br />5.2 Trip Distribution and Assignment ............................. <br />5.3 Midblock Operation ...... . <br />5.4 Intersection Operational Analysis ............................. <br />6. RESIDENTIAL IMPACT .......... ............................... . <br />7. GUIDELINES FOR DESIGN STANDARDS ............................ <br />8. MITIGATION MEASURES ........................................ <br />8.1 Proposed Bus Turnout Locations ............................. <br />8.2 Signal Installation ........ ............................... . <br />APPENDIX <br />Figures <br />Figure 3 -1 <br />Figure 3 -2 <br />Figure 4 -1 <br />Figure 5 -1 <br />Figure 6 -1 <br />Figure 7 -1 <br />1 <br />2 <br />2 <br />4 <br />6 <br />6 <br />10 <br />10 <br />16 <br />18 <br />23 <br />23 <br />23 <br />28 <br />28 <br />32 <br />35 <br />40 <br />40 <br />41 <br />Vicinity Map ............ ............................... 7 <br />Existing Lane Configuration .. ............................... 13 <br />Future Lane Configuration (General Plan, Year 20066) ............... 22 <br />Traffic Analysis Zones ...... ............................... 24 <br />Peak Hour Warrant Future With Specific Plan .................... 34 <br />
The URL can be used to link to this page
Your browser does not support the video tag.