Laserfiche WebLink
iR <br />DKS Associates <br />Table of Contents <br />EXECU'T`IVE SUMMARY <br />1. INTRODUCTION ............................................... <br />2. PROJECT DESCRIPTION .......... ............................... <br />21 Bristol Street Widening Project ............................... <br />2.2 Bristol Street Specific Plan .................................. <br />3. EXISTING CONDITIONS ......................................... <br />3.1 Major Street Characteristics ................................. <br />3.2 Midblock Capacity Analysis ................................. <br />3.3 Intersection Capacity Analysis ................................ <br />3.4 Bus Transit ............................................ <br />4. GENERAL PLAN CONDITION (YEAR 2006) WITH AND WITHOUT <br />WIDENING ...... . . . ... .... ....................... .. . . . ... <br />5. SPECIFIC PLAN IMPACT ......... ............................... <br />5.1 Trip Generation .. . . . .... ............................... . <br />5.2 Trip Distribution and Assignment ............................. <br />5.3 Midblock Operation ...... . <br />5.4 Intersection Operational Analysis ............................. <br />6. RESIDENTIAL IMPACT .......... ............................... . <br />7. GUIDELINES FOR DESIGN STANDARDS ............................ <br />8. MITIGATION MEASURES ........................................ <br />8.1 Proposed Bus Turnout Locations ............................. <br />8.2 Signal Installation ........ ............................... . <br />APPENDIX <br />Figures <br />Figure 3 -1 <br />Figure 3 -2 <br />Figure 4 -1 <br />Figure 5 -1 <br />Figure 6 -1 <br />Figure 7 -1 <br />1 <br />2 <br />2 <br />4 <br />6 <br />6 <br />10 <br />10 <br />16 <br />18 <br />23 <br />23 <br />23 <br />28 <br />28 <br />32 <br />35 <br />40 <br />40 <br />41 <br />Vicinity Map ............ ............................... 7 <br />Existing Lane Configuration .. ............................... 13 <br />Future Lane Configuration (General Plan, Year 20066) ............... 22 <br />Traffic Analysis Zones ...... ............................... 24 <br />Peak Hour Warrant Future With Specific Plan .................... 34 <br />