My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Exhibit 4-4_55A_RIS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
02/04/2014
>
Exhibit 4-4_55A_RIS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2014 7:46:44 AM
Creation date
1/29/2014 3:40:57 PM
Metadata
Fields
Template:
City Clerk
Agency
Public Works
Item #
55A
Date
2/4/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I SUMMARY AND PROJECT DATA <br />A. Purpose of Study <br />The purpose of this study is to provide the California <br />Department of Transportation, the City of Santa Ana and the <br />general public with information as to displacement effects/ <br />relocation resources related to the proposed widening of Bristol <br />Street, in the City of Santa Ana. <br />B. Limits and Purpose of Project <br />The purpose of the subject project is to improve the flow of <br />local and through traffic along Bristol Street, between Warner <br />Avenue and Memory Lane, covering a distance of approximately 3.9 <br />miles. (See Figure 1, following.) <br />C. Corridor and Alignments Studied <br />1. Number of alternatives studied: 4 <br />a. Alternative 1 = Widening on both sides of Bristol, to <br />achieve 120' right -of -way. <br />b. Alternative 2 = Widen along east side only, to achieve a <br />120' right -of -way. <br />c. Alternative 3 = Widen along west side only, to achieve a <br />120' right -of -way. <br />d. Alternative 4 = No Project <br />2. Is there a "core" corridor common to all alternatives? Yes -- <br />The present Bristol Street right -of -way and a depth of one <br />parcel along both sides of the street, throughout the project <br />corridor. <br />3. Comments: Widening alternatives would also include additional <br />spot widening at several intersections, affecting all legs, to <br />accommodate special features such as bus turn -outs, left <br />turns only, and right -turn only lanes. Also, each alternative <br />would realign Bristol Street to the west to avoid any widening <br />along the frontage of the Santiago Elementary School site. <br />The entire corridor lies within the City of Santa Ana. <br />D. Character of Displacement Area <br />1. Location in Relation to General Community: Subject segment <br />of Bristol Street runs north and south, roughly in the center <br />of the City, and is one of the most utilized north -south <br />arterial corridors in the City. Bristol Street connects with <br />the Garden Grove freeway (State Highway 22) just north of <br />the project area. <br />006710 <br />-1- <br />
The URL can be used to link to this page
Your browser does not support the video tag.