My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MARIPOSA LANDSCAPES, INC. (STREET MEDIANS) - 2013
Clerk
>
Contracts / Agreements
>
M
>
MARIPOSA LANDSCAPES, INC. (STREET MEDIANS) - 2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2014 11:09:09 AM
Creation date
1/30/2014 10:23:05 AM
Metadata
Fields
Template:
Contracts
Company Name
MARIPOSA LANDSCAPES, INC.
Contract #
A-2013-097
Agency
PUBLIC WORKS
Council Approval Date
6/17/2013
Expiration Date
6/17/2015
Destruction Year
2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
at such other times when directed by the Projects Manager or <br />designee. Infill planting of bare shrub areas shall be replanted in <br />the months of March through June with plant material of the same <br />species one time per year as part of routine maintenance at no <br />additional cost to the City. <br />4) Watering <br />a. All shrubs shall be properly irrigated to maintain a healthy <br />condition. Shrub areas shall be deeply watered as <br />required by weather conditions to provide adequate <br />moisture for optimum growth. At no time shrub areas shall <br />be allowed to show a lack of fresh green color or a loss of <br />resilience due to lack of water. <br />b. Wherever or at any time that an irrigation system is <br />damaged, fails or does not adequately cover the shrub <br />area in which it is installed, the Contractor shall furnish and <br />set out hoses and sprinklers, or other portable means, as <br />required to uniformly water the shrub. <br />C. Automatic irrigation shall be conducted between the hours <br />of 10:00 p.m. and 4:00 a.m. and shall be programmed to <br />prevent excessive runoff, ponding or over watering. <br />d. Shrub areas shall not be maintained in an over watered <br />and /or saturated condition. <br />e. Contractor shall respond immediately to signs of plant <br />stress. Plant material lost due to stress shall be deemed <br />Contractor negligence, as determined by the Projects <br />Manager or designee, and replaced at Contractor's <br />expense. <br />5) Replanting <br />The Contractor shall be responsible for the complete removal and <br />replacement of shrubs lost due to normal attrition or due to <br />Contractor's faulty maintenance or negligence, as determined by <br />the Projects Manager or designee, at no additional cost to the <br />City. <br />6) Cultivation and Mulch <br />a. All bare soil or open areas shall be either cultivated weekly or <br />covered by a minimum of two (2) inches of mulch. All mulch <br />material shall be of a recycled product free from foreign <br />grasses and weeds and shall be approved by the City. At no <br />time shall weeds be allowed to remain in bare or planted <br />areas. <br />
The URL can be used to link to this page
Your browser does not support the video tag.