My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
UNITED STORM WATER, INC -2012 AMENDMENT 1 - 2013
Clerk
>
Contracts / Agreements
>
U
>
UNITED STORM WATER, INC -2012 AMENDMENT 1 - 2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2020 8:25:34 AM
Creation date
1/30/2014 10:56:17 AM
Metadata
Fields
Template:
Contracts
Company Name
UNITED STORM WATER, INC.
Contract #
A-2013-114
Agency
PUBLIC WORKS
Council Approval Date
7/15/2013
Expiration Date
6/30/2014
Insurance Exp Date
12/31/2013
Destruction Year
2019
Notes
A-2012-105
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HOURLY RATES FOR OPERATED EQUIPMENT — INCLUDES OPERATOR <br />ITEM EQUIPMENT STRAIGHT TIME *OVERTIME * *HOLIDAY <br />NO. <br />116 John Deere 555 Crawler Loader /Backhoe /Cat 950 Loader transport <br />$ 105.00 $125.00 $155.00 <br />** IMPORTANT: SEE NOTES ON NEXT PAGE <br />HOURLY RATES FOR OPERATED EQUIPMENT — INCLUDES OPERATOR <br />ITEM EQUIPMENT STRAIGHT TIME *OVERTIME * *HOLIDAY <br />NO. <br />NOTES: <br />Prevailing Wage Surcharge $ 35.00/hr. <br />When Prevailing Wage Rates or Davis Bacon Wage Rates Apply: There will be an additional charge of <br />$30.00 per hour for all personnel and/or operated equipment. <br />*Overnight demurrage on vacuum trucks, end dumps, drop deck, and dry vans $250.00 /day <br />717 Fuel Surcharge/insurance 20% of Trucking Charges <br />Overtime: Overtime applies to vehicles listed above during any period worked in excess of 8 hours per day <br />Monday through Friday and from Friday Midnight through Sunday Midnight <br />Holidays are listed on Page 3 <br />All charges are computed on a portal to portal basis from our City of Industry Terminal. <br />A four hour minimum applies to all equipment and personnel called out. <br />Traffic Control Eoniument <br />A. Operated <br />125 Cushion Truck $100.00 <br />126 C.M.S. Truck $100.00 <br />(changeable Message Sign) <br />B. Unoperated <br />127 Arrow Board <br />128 Traffic Cones <br />129 Traffic Signs <br />$116.00 $150.00 <br />$116.00 $150.00 <br />$ 60.00 /day <br />$ .60 /day /ea. <br />$ 3.50/day/ca. <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.