My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25E - AGMT - GRAND TRAFFIC SIGNAL SYNC PROJECT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
02/04/2014
>
25E - AGMT - GRAND TRAFFIC SIGNAL SYNC PROJECT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2014 7:53:16 AM
Creation date
1/30/2014 4:03:19 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25E
Date
2/4/2014
Destruction Year
2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COOPERATIVE AGREEMENT NO. C- 3.2084 <br />ATTACHMENT A <br />KRAEMER BOULEVARD / GLASSELL STREET! GRAND AVENUE -- TSSP <br />Appropriate cycle lengths consistent with the goals of this effort. Additionally, <br />CONSULTANT shall recommend time -of -day start and stop intervals for the various timing <br />plans based on the Identified peaks from the 24 -hour machlne counts, and field <br />observation. <br />o .CONSULTANT shall prepare, at minimum, a total of.three (3) timing plans. for..a typical <br />weekday which consider the following peak periods: AM PEAK, MID -DAY PEAK, PM PEAK <br />and one (1) timing plan for a typical Saturday for a MID -DAY PEAK. Timing plans should be <br />in both Synchro format and the preferred timing chart format of each local AGENCY. <br />CONSULTANT shall develop an operational model within SlmTraffic. The operational analysis will <br />be used to micro — simulate and analyze specific roadway segments with queuing, spill back, <br />starvation, storage blocking, and other queuing interactions, and to analyze and mitigate the <br />conditions discovered by CONSULTANT and /or APM and AGENCIES in field reviews. <br />CONSULTANT shall develop optimized signal timings using the results from PTV Vistro 2 and/or <br />Synchro /SimTraffic 8.0, in conjunction with Tru- Traffic version 10.0 or latest released version and <br />recommend any changes to the signal phasing at each signalized intersection that may Improve <br />the efficiency of operations. Output of the modeling software shall not be utilized without proper <br />QA/QC. Engineering judgment shall be utilized to determine final operational parameters. The <br />recommended signal timing plans shall be reviewed by the APM and local AGENCY staff. <br />Time of Day /Day of Week (TOD /DOW) Timing Plan selection schedules shall be developed that <br />reflect actual traffic conditions within contiguous segments or down to the individual Intersection as <br />necessary. The CONSULTANT, in cooperation with the APM, and upon concurrence of the Traffic <br />Forum, shall develop a real time traffic responsive operations (TRO) program to facilltate timing <br />plan selection based on data obtained from the project. The program shall select the timing plans <br />relative to volume, occupancy, speed, if available, and directional flows on a 24hour /7 days per <br />week schedule, All forms of detection for all modes of travel may be employed in this endeavor. A <br />library of timing plans shall be developed to facilitate this requirement. A static TOD /DOW <br />schedule shall be developed and set ready as backup in case of detection failures within the TRO <br />program <br />Upon approval of the optimized signal timings by the Authority and the cities, the CONSULTANT <br />shall implement, or assist local AGENCIES staff in the implementation of new signal timings either <br />through the central traffic signal system (if available) or direct implementation at the intersection <br />controller units. CONSULTANT shall use existing traffic signal interconnection systems, where <br />they exist, and, as a result of the inter- jurisdictlonal nature of the project, shall implement time - <br />based signal coordination techniques across signals controlled by different AGENCIES. <br />As the project will be using time -based signal coordination, the CONSULTANT shall evaluate the <br />current time - referencing of all traffic signal controllers and recommend a corridor -wide strategy to <br />ensure that all traffic signal controllers are on synchronized time clocks linked to a master time <br />source, CONSULTANT shall verify that all Central Master or Local Field Master, and /or Local <br />Controller unit clocks are: <br />• operating properly and are synchronized; <br />• and that all clocks are referencing a Coordinated Universal Time (UTC) and the start for all <br />cycle length Calculation shall be 12:ODAM — Midnight. <br />PE1028 <br />