Laserfiche WebLink
COOPERATIVE AGREEMENT NO, C -3 -2084 <br />ATTACHMENT A <br />KRAEMER BOULEVARD I GLASSELL STREET I GRAND AVENUE — TSSP <br />Task 9: Project Report <br />At the end of the one (1) year Implementation Phase of the three (3) year contract period, <br />CONSULTANT shall prepare a Final Report with an executive summary. The report shall provide <br />complete documentation of the project, including, but not limited to, project objectives, project <br />locations, project scope, findings, recommendations, implementation schedule, improvements <br />__.....__. accomplished, report. on. the.. Continued... Signal._.Timing..Support per Task..8, . and. procedures for <br />continuing maintenance, surveillance, and evaluation of the coordinated signal system, work <br />performed, data collected: 'before' and 'after' studies and project benefits achieved In terms of fuel <br />savings, travel time, and other measurable parameters. The report shall document all planned and <br />programmed improvements on the study corridor as well as recommendations for further <br />infrastructure improvements that would likely improve the corridor signal coordination project <br />results. CONSULTANT shall present the final report and results of the project to the Board and city <br />councils as required. The report shall be completed in accordance with the current CTFP <br />Guidelines. <br />The report shall include for each Intersection the lane configurations; signal phasing, turning <br />movement data, and cycle lengths for existing and proposed timings for all peak periods. In <br />addition, in a separate binder, all the traffic signal phase sequences, signal timing plans, and <br />pedestrian timings shall be documented. Finally, the report shall provide recommendations with <br />cost and benefit estimates for future improvements to traffic signal infrastructure (signal controllers, <br />vehicle detection, communications, etc.), intersection capacity (appropriate signal phasing, lane <br />geometrics, and alleviation of physical bottlenecks that curtail arterial capacity), and traffic <br />management strategies. These proposed improvements are beyond the scope of this <br />demonstration project but should be useful in determining future enhancements to the corridor. <br />At the end of the three (3) year contract period, the CONSULTANT shall prepare for OCTA the <br />FINAL REPORT as required by the M2 Ordinance and Ch. 10 of the CTFP Guidelines for Fiscal <br />Year 2013. This report is a fill in form type of report. <br />Deliverables — Task 9: <br />1. Draft and Final PROJECT Signal Synchronization Project Report (one electronic master, two <br />hardcopies to Authority, and one hardcopy per AGENCY) and Presentations at the end of the <br />one (1) year Implementation Phase, <br />2. Final PROJECT Report per Chapter 10 of Fiscal Year 2013 CTFP Guidelines. <br />Pa25E1 =33 <br />