My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25G - AGMT - PAVEMENT MGT CONSULTANT SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
02/04/2014
>
25G - AGMT - PAVEMENT MGT CONSULTANT SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2014 7:53:17 AM
Creation date
1/30/2014 4:05:31 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25G
Date
2/4/2014
Destruction Year
2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Peter J. Bucknam / Project Manager <br />Director of Infrastructure Management— GIS <br />EDUCATION <br />B.A., Geography — Urban Planning, San Diego State University, 1997 <br />PROFESSIONAL DATA <br />Member, American Public Works Association <br />Member, Maintenance Superintendents Association <br />Chair, Transportation Committee, Inland Empire Report Card (ASCE) — 2005/06 & 2008/09 <br />Co- Chair, Member APWA Committee for Street and Technology 2003 -2013 <br />Certificate of Professional Development — MicroPAVER <br />Certificate of Completion — OCTA MicroPAVER Distress Training (2011) <br />NASSCO — Certificate, National Pipeline Assessment Certification Program (PACP) <br />QUALIFICATIONS/ EXPERIENCE OVERVIEW <br />Peter Bucknam is an expert in infrastructure project management, training, planning, resource management, <br />implementation and program management. He has over fourteen years' experience in the area of Geographic <br />Information Systems and infrastructure asset management. Mr. Bucknam has managed a wide range of <br />infrastructure project tasks including the collection and input of infrastructure survey data, preparation of <br />Public Works capital improvement program projections and reports, infrastructure /software needs <br />assessments, GIS /GPS data collection, data conversion and quality control. <br />Mr. Bucknam has performed infrastructure management services to over 60 local agencies and is currently <br />serving as project manager for numerous pavement management programs throughout Southern California. <br />He has personally served as project manager for 200 PMP projects throughout Riverside, San Bernardino, San <br />Diego, Orange and Los Angeles counties. He has worked with over 20 Los Angeles cities and he is currently <br />working with fifteen (15) of the 34 Orange County agencies regarding Measure M2 MicroPAVER compliance. <br />His project level and management experience covers: pavement /sidewalk management, Traffic Control Device <br />Inventories (TCDI), GIS implementation, Traffic Signal surveys, Right -of -Way (ROW) surveys, and ADA <br />survey /compliance. In managing over 200 infrastructure projects in the past fifteen years, Mr. Bucknam has <br />used a diverse amount of software to assist local agencies implement infrastructure management programs <br />and GASB 34. These programs include MicroPAVER, MTC, LambdaTech's GPSVision, Cart6Graph, ESRI <br />products, Crossroads, Stantec, GBA Master Series, and Mapinfo. <br />Prior to joining Bucknam Infrastructure Group, Inc., Mr. Bucknam served as Director of Infrastructure <br />Management -GIS with an Engineering consulting firm where he managed numerous public works <br />infrastructure /ROW projects ranging from surveying, maintenance life- cycles, cost & benefit analysis, <br />financing and construction cost estimating. This included researching, surveying, converting and <br />implementing multiple phase pavement management projects which provided better management practices, <br />data efficiencies and GIS functionality within local governments and maintenance facilities. In addition, he <br />provided technical (software) support for the on -going citywide PMS projects as well as developing capital <br />improvement plans /budgets for integrating Tablet -GIS data management functionality into future <br />maintenance efforts. <br />25G -19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.