My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
55A - RESO - ADDENDUM BRISTOL STREET WIDENING
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
02/04/2014
>
55A - RESO - ADDENDUM BRISTOL STREET WIDENING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2014 5:07:10 PM
Creation date
1/30/2014 4:18:15 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
55A
Date
2/4/2014
Destruction Year
2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENTAL IMPACT REPORTADDENDUM <br />Bristol Street Widening Phase 1118 — Washington Avenue to 17fh Street <br />a variety of land uses such as commercial, office, residential and open space as provided in the approved <br />Specific Plan document. The proposed Project would not result in changes to the land use designation of <br />the acquired parcels. The proposed Project is in compliance with the existing designation and would not <br />create a new conflict. No significant impact is anticipated. Impacts would be similar to those identified in <br />the 1990 FEIS /EIR. <br />Mitigation Measures <br />No new additional mitigation measures are required. <br />c.) Conflict with any applicable habitat conservation plan or natural community conservation plan? <br />The Project site is not a part of any habitat conservation plan, and is located within a highly urbanized <br />area within the City of Santa Ana. The proposed widening would not conflict with any habitat <br />conservation plan or natural community. No impact is anticipated. Impacts would be similar to those <br />identified in the 1990 FEIS/EIR. <br />Mitigation Measures <br />No new additional mitigation measures are required. <br />3.11 Mineral Resources <br />This section corresponds with Section W - Environmental Consequences and Mitigation Measures, <br />Subsection W - Consumption of Renewable and Non - Renewable Resources of the 1990 FEIS/EIR. <br />a.) Result in the loss of availability of a known mineral resource that would be of'value to the region <br />and the residents of the state? <br />The Project site is currently developed and does not contain any areas that are utilized for the extraction <br />of mineral resources. Furthermore, the proposed Project would not involve excavation that would likely <br />identify previously unidentified mineral resources. No impact to mineral resources would result from the <br />proposed Project. Impacts would be similar to those identified in the 1990 FEIS/EIR. <br />Mitigation Measures <br />No new additional mitigation measures are required. <br />b.) Result in the loss of availability of a locally - important mineral resource recovery site delineated <br />on a local general plan, specific plan or other land use plan? <br />The Project site is currently developed and is not delineated as a mineral resources recovery site by the <br />City of Santa Ana General Plan. Implementation of the proposed Project would have no impact on the <br />mineral resources and no mitigation measures are necessary. Impacts would be similar to those identified <br />in the 1 990 FEIS /EIR. <br />ANA 111 -334 (PE.R- 02 -01) CITY OF SANTA ANA (01/30/2014 REVS) 132897 CM PAGE 43 <br />55A -52 <br />
The URL can be used to link to this page
Your browser does not support the video tag.