Laserfiche WebLink
D. If the applicable designated construction project <br />has been abandoned, delayed, or abandoned <br />and then restarted, or if the authorized contract- <br />ing parties deviate from plans, blueprints, de- <br />signs, specifications or timetables, the project <br />will still be deemed to be the same construction <br />project. <br />E. The provisions of Limits Of Insurance (SECTION <br />III) not otherwise modified by this endorsement <br />shall continue to apply as stipulated. <br />Page 2 of 2 Copyright, Insurance Services Office, Inc., 1996 CG 25 03 03 97 <br />