My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - AGMT - SEWER AND WATER FINANCIAL PLAN
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
02/18/2014
>
25C - AGMT - SEWER AND WATER FINANCIAL PLAN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2014 3:12:30 PM
Creation date
2/13/2014 1:54:42 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25C
Date
2/18/2014
Destruction Year
2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana, CAI SANITARY SEWER AND WATER FINANCIAL PLAN <br />a workshop setting to incorporate City - specific experience with <br />each asset class. We anticipate one 2 -hour workshop for each <br />area of capital infrastructure (sanitary sewer and water). <br />PA Understanding the time - sensitive nature of this study, Black & <br />Veatch will leverage our extensive asset class library to the extent <br />possible to collaboratively guide the City. <br />3,4 Define appropriate method for the City of determining asset value <br />to comply with GASB34 /35 standards, Black & Veatch proposes <br />evaluating the reproduction cost new less depreciation (RCNLD) <br />for assets within the inventory, as it provides a more accurate <br />account of current "value" of the assets than original acquisition <br />cost, less depreciation, CAMPS will be used to generate current <br />asset values and depreciation, <br />3.5 Develop R &R schedules from CAMPS projecting the specific <br />capitalized rehabilitation, replacement, and costs needed for the <br />next 20 years. Costs are escalated to the year of the R &R. <br />3.6 Prioritize the R &R schedule based on "needs first" constraint. <br />Needs first relies on the rehabbing or replacing assets that have <br />the highest immediate possibility of failure based on their <br />condition or life cycle. The updated R &R schedule will serve as the <br />basis for R &R activities in the rate analysis portion of the study. <br />3.7 Specific considerations in the evaluation will be using NASSCO <br />standards for sewer pipes and the incorporation of the water <br />meter replacement program, <br />SEWER AND WATER RATE STUDY <br />Task 4— Financial Plan <br />The objective of this task is to develop the financial plan for the sanitary <br />sewer and water systems. Specific subtasks are: <br />4.1 Review the latest Master Plans and Capital Improvement Program <br />(CIP) documents Black & Veatch will examine <br />major CIP to: (1) identify whether the list of <br />proposed projects appears to adequately and <br />thoroughly address sanitary sewer and water <br />improvement needs for the planning period, <br />and (2) determine whether the City's <br />methodology for project cost estimating <br />appears reasonable. <br />4.2 Develop historical bill tabulation for water <br />based on current billing system. The bill <br />BLACK & VEATCH I Methodology <br />25C -11 <br />loo =r< <br />Bill Tabulation Blutrlbullmt <br />80% <br />to <br />zo% <br />a <br />6090 <br />e <br />w <br />3DY. <br />p <br />zo% <br />lo% <br />e <br />o =, <br />u <br />1 to loo t,000 10,000 100,000 <br />bloalhly wmer Usage - Cif <br />---- ftsiknti�b - - •CommeaW— - - IndWlul <br />so% <br />80% <br />zo% <br />6090 <br />3DY. <br />zo% <br />lo% <br />o =, <br />
The URL can be used to link to this page
Your browser does not support the video tag.