My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25D - AGMT - WATER SYS COMPUTER SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
02/18/2014
>
25D - AGMT - WATER SYS COMPUTER SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2014 3:14:17 PM
Creation date
2/13/2014 1:54:49 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25D
Date
2/18/2014
Destruction Year
2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />0 IDM will bring additional value to <br />this project by applying the <br />calibrated hydraulic model for <br />planning and operational analysis <br />to support the City's future Water <br />Master Plan, and daily operations. <br />Analyze: IDM will perform value-added services to <br />the scope of this project, by including the following <br />planning and operational analyses: <br />• Fire flowanelysis <br />• Criticality analysis <br />• water quality analysis <br />• Energy analysis <br />Fire flow Analysis: IDM will use the calibrated <br />Maximum Day Demand, Steady State hydraulic model <br />scanarlo to apply the fire flow requirements defined <br />In TM #1 of this Project to each model junctions <br />which represents a fire hydrant. IDM will perform <br />global fire flow simulations to determine Available <br />Flow @20psi, and measure that available flow against <br />the fire flow requirement to determine adequate fire <br />protection. IDM will generate summary tables and <br />color -coded maps similar to the figure shown herein, <br />to help visualize and interpret results. <br />Criticality: IDM will conduct a valve criticality analysis <br />to assess the City's water system vulnerability, and <br />pipelines which have the greatest consequence of <br />failure to customers and operations. IDM will use <br />the calibrated Maximum Day Demand, Steady State <br />model scenario for this analysis. IDM will generate <br />summary tables and color-coded maps to visualize <br />and Interpret results. <br />Water Quality: IDM will use the calibrated Average <br />Day Demand, 72 -hour Extended Period Simulation <br />hydraulic model scenario to perform a water age <br />analysis of the City's water system. IDM will extend <br />this water quality simulation to the required duration <br />for system hydraulics to achieve equilibrium to <br />extract water age results. IDM will measure the City's <br />predicted water age against the operational criteria <br />defined in TM #1. We will create tables and color - <br />coded mapping to illustrate locations of poor <br />circulation for City unidirectional - flushing. <br />Energy; IDM will use the calibrated Maximum Day <br />Demand, 72 -hour Extended Period Simulation <br />hydraulic model scenario to assess the City's current <br />TDU strategy, evaluate locations of excessive head <br />loss, and evaluate up to 2 operational control <br />strategies with the goal of reducing overall energy <br />consumption. We will create tables and color -coded <br />mapping to illustrate areas of potential savings. <br />Color -coded Map of Water Age, <br />Indio Water Authority <br />Final Technical Memorandum (TM #7) -. <br />19 The Final Technical Memorandum will <br />Include an executive summary of the <br />results of each prior TM, as well as an <br />Appendix titled "Hydraulic Model <br />Analysis" for the City's ongoing Water Master Plan <br />support. IDM will summarize results of all proposed <br />analyses In the Final Memorandum. IDM will also <br />provide these analyses in a GIS format, fully <br />supported by the Sustainable Deliverable described <br />below under "Summary of Deliverables ". <br />I V M O L/ ELI 1 G0 36 <br />ele can be mote, together. <br />25D -20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.