Laserfiche WebLink
APPENDIX A Proposal Response Form <br />(Continued) <br />25. Do you charge different hourly rates for labor depending on qualifications needed for <br />cabling services? If so, please list all rates by employee title. <br />26. Does your company have a minimum charge on a job? <br />27. Does your company charge for travel time? <br />28. What is your mark -up percentage on materials? <br />29. Please list what your company would charge for the sample materials listed below: <br />CommScope SYSTIMAX 4 pair Non - plenum Category 5e UTP $ <br />cable (price per foot) <br />CommScope SYSIMAX 4 pair Plenum Category 5e UTP cable $ <br />(price per foot) <br />CommScope SYSTIMAX 1100CAT5 24 Port Patch Panel $ <br />(Category 5e) <br />CommScope SYSTIMAX 11 OPA230OFT 110 -type panel system $ <br />CommScope SYSTIMAX M14A Modular Faceplate $ <br />Chatsworth standard equipment rack model #55053 -503 $ <br />30. In order to obtain a general guideline of pricing for products and services rendered, below <br />are two sample jobs that need to be quoted. <br />Any details not provided shall be clarified using the standards and practices outlined in the <br />RFP document above, or by contacting Carl Marek, Telecommunications Coordinator, at <br />the number listed in the RFP. <br />Please provide a quote for the following sample jobs: <br />Page 20 of 36 <br />