Laserfiche WebLink
APPENDIX A Proposal Response Form <br />(Continued) <br />4. Describe the most relevant experience in providing cabling services. (ref: section 2 1.1.3) <br />PCC has performed maintenance solutions for the City of Santa Ana since 2003. PCC also <br />provides cabling solutions and maintenance for other Cities such as Beverly Hills Long Beach <br />5. Include references for a MAXIMUM of three similar successfully undertaken and <br />completed CommScope SYSTIMAX projects as outlined in this RFP. fret: section 2.1A sj <br />Reference One: <br />Name of Client <br />City of Beverly Hills <br />Location where work was performed <br />Beverly Hills _ <br />Knowledgeable contact <br />Mr. David Schirmer, Director of IT <br />Contact's phone number <br />310.285,2581 <br />Brief description of type of CommScope <br />PCC Network Solutions recommended, designed <br />SYSTIMAX related work completed <br />and installed a Category 6 CommScope SYSTIMAX <br />(Indicate type of systems installed, general quantities and <br />Structured Connectivity Solution to over 600 <br />configuration of outlets, etc.) <br />locations at City Hall to support their higher <br />bandwidth requirements. The solution supports <br />proprietary software, general office and a sever - <br />based storage area network for the City's 1,000 <br />employees. The solution also accommodated <br />Extreme NeLworks'10 -Gi abit core switches. <br />Was the project completed on time? <br />❑ No 2 Yes <br />_ <br />Was the project completed within budget? <br />❑ No 0 Yes <br />Reference Two: <br />Name of Client _ <br />Santa Barbara Airport _ <br />Location where work was performed <br />Santa Barbara <br />Knowled eable contact <br />Leif Reynolds <br />Contact's phone number <br />805.692.6020 <br />Brief description of type of CommScope <br />SBA selected a complete CommScope Systimax <br />SYSTIMAX related work completed <br />solution with Corning fiber and CPI racks /cabinets. <br />(indicate type of systems Installed, general quantities and <br />The project consisted of a total of 1300 Cat6 data <br />configuration of outlets, eta) <br />connections, a horizontal copper build out which <br />included both secured and unsecured Cat6 2077, <br />Giga Speed Cat 6 cabling to support airport <br />administration, public and private telephone <br />service, flight information systems, TSA, airline <br />gate services, airport security, baggage control, <br />and wireless services. A CommScope Patch Cable <br />Management System was also installed to provide <br />SBA with the ability to do real -time cable <br />management monitoring. <br />Was theprolect completed on time? <br />_ <br />❑ No Z Yes <br />Was the project completed within budget? <br />❑ No 0 Yes <br />Page 2 of 9 <br />