Laserfiche WebLink
z <br />Previous site plans referenced for the October 5, 2013 study showed the parking area on the west <br />side of the building would be expanded to provide six (6) additional parking spaces. Based on <br />further investigation by the applicant, it was determined construction of these added parking <br />spaces was not feasible, so they are not a part of the current Project. Still a part of the Project; is <br />the elimination of the fogs existing spaces at the northeast portion of the building, to be replaced <br />with an enhanced entry area. The new garage is anticipated to provide some vehicle parking but <br />to provide a conservative evaluation, the parking in the garage has not been counted in the <br />parking supply /demand analyses. <br />PARKING ANALYSES <br />In the previous analyses, parking demand counts were conducted on Wednesday (10/2/13). City <br />of Santa .Ana staff request an additional day of counts, so Sasaki. Transportation Services; Inc. <br />C'STS") conducted field parking counts and observations on Thursday (1/23/14). Summaries of <br />the count data and findings are presented below. <br />Parking Demand Counts <br />The additional parking demand counts were conducted (1/23/14) at the Boys and furls Club <br />parking lots_ In addition, the elementary school parking lot across the street from the Bays and <br />Girls Club was counted since the applicant indicated they may use this lot on occasion for <br />overflow parking (i.e,, during special events), <br />The existing demand counts for the parking lot west of the Boys and Girls Club was separated <br />Into three areas (Areas A, B, and C). The fourth area CD") is located at the northeasterly corner <br />of the site and has four parking spaces. Aerial Googly Maps printouts of the Club lot and <br />elementary school lot, with the parking study areas noted are provided in the Attachments, <br />In general, the Field parking demand counts account for the specific operation of this Boys and <br />Girls Club (i.e., attendance by children, walking proximity of schools, limited vehicle use, cto) <br />differing peak parking demands for CHOC, and the potential for use of the elementary school <br />parking, The peals parking demands for the Project operations were observed again to <br />supplement the previous findings (10/5/13 report). <br />The peak operating tunes for the Club are weekdays 2:00pm- 6 ;00pm; the previous and current <br />counts were conducted during this peak time period. As previously noted, the study day and date <br />are: <br />Thursday (1/23/14) <br />As shown on the aerial photo of the Chub lot, provided in the Attachments, the Project site was <br />divided into parking areas "A" through "D " so detailed parking demand information would be <br />available for reference. <br />SA.SAMTRANSPORTATION SERVIC7'+S, rive. B&G Club, Santa Ana <br />a &e; Park Addenda, Fen -14 Addendum Parking Study <br />