Laserfiche WebLink
Exhibit /k~ Request for Proposal — Scope o[Services <br />DESCRIPTION AND SCOPE OF WORK <br />The City of Santa Ana is issuing this Request for Proposals (RFP) for Construction Surveying and <br />Map Checking Services. <br />Construction Surveying Service <br />1n general, the Consultant shall perform monument preservation and construction staking various <br />(]{y projects wmunms,meeAod&ayio.&Cu|Wnnim'|iconwadoaudxumgynry&mQbe|nospmnsible <br />charge mf all survey work performed tinder the contract <br />The Consultants services shall include, but not b* limited to, the following: <br />& Research existing County and City records for survey monuments within the project area. <br />D� Prior to any clearing, removal, or excavation afforts, perform a diligent search for property <br />line monuments, street centedine monuments, and benchmarks within the project area, <br />recording their identities and precise locations in reference to monuments or witness <br />monuments that will not be disturbed during construction. The records of these monuments <br />and references shall conform to Section 8771 of the Business and Professions Code of the <br />State nJCalifornia. After completion rf the construction, any monument disturbed o, <br />removed during construction shall be reset, conforming to Section 8771, Each centerline <br />intersection shall be drawn an a single Comer Record showing local fie points and tie <br />distances. The Comer Records shaJI be drafted in Microstation (version 8 or earlier), anda <br />digital copy mf each submitted to the City. <br />C� Provide construction staking for project improvements, P rds of the line and /ad tmkmm <br />(cut shears) shall be on forms provided by the City, and the originals shall become the <br />property my the City upon completion wY each survey mmt7lne City wiffl provide digital <br />construction p/mmw and specifications for each project The consultant shaft h/miyb bard <br />copies *f plans for field personnel auneeded, <br />D� Set line and grade stakes in accordance with the plans and specifications- Notiffy the City <br />immediately ni any diso*panniau design errors discovered on the plans during staking or <br />when verifying the line and grade uf existing improvements at join points. <br />E Complete the construction staking within the time frame specified on the Survey Request <br />Form, or (given minimum notice) commence the slaking mo later than two working days from <br />the receipt uf the request, providing continuous service until the request iscomplete, <br />F. Furnish all office support, labor, materials, equipment, toots, and incidentals necessary to <br />complete the specified surveys- The costs for these items shall be included in the hourly or <br />lump sum costs and no additional compensation will boallowed then*8xnw. <br />������ <br />�����U � <br />