My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25E - AGMT - CONSTRUCTION SURVEYING SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
04/15/2014
>
25E - AGMT - CONSTRUCTION SURVEYING SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2014 4:05:21 PM
Creation date
4/10/2014 3:20:31 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25E
Date
4/15/2014
Destruction Year
2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
U. With the coordinate values, a full location and detailed description, including point character <br />with reference(s), shall be provided for all found and set monuments for the project. For this <br />purpose, a sketch of the control network is required_ <br />V. Copies of all survey field notes and raw data files shall be provided along with a listing of the <br />final coordinates for all surveyed points. The digital file format for the listing shall be: point <br />number, northing, easting, elevation, description (comma delineated with no spaces, one <br />point per line)- The coordinate precision shall be one hundredth of a foot. <br />W. At any given time the City may need to mobilize survey crews to different project sites, the <br />consultant shall have a minimum of three (3) survey crews for mobilization. <br />X. All City CARD standards as well as Microstation configuration files are located at: <br />Y. htip:ltwww.santa-ana.orglpwa/EngineeringServices.asp <br />IMPLEMENTATION <br />A. City staff shall have the right to modify, reduce, or delete the services as needed by City, <br />B. The term of the contract shall be for two (2) years which shall commence on the date that <br />City Council approves the award or the date that all required bonds and insurance have been <br />approved by the City Attorney, whichever occurs last <br />PERFORMANCE SCHEDULE <br />A. City staff will provide written request for quotes. The consultant will respond, in writing within <br />3 working days. The City can request lump sum or hourly rate quotes. The consultant shall <br />provide backup documentation for all expenses upon City request. <br />B. Upon approval and within 7 working days, the City shall issue the Notice to Proceed. Survey <br />work shall begin within 2 working days from the receipt of the Survey Request Form. Map <br />checking work shall begin as indicated on the Notice to Proceed. <br />C. The City reserves the right to assess liquidated damages or terminate the contract. <br />D. City -staff shall have the fight to negotiate the terms of the quote- <br />25E-1 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.