Laserfiche WebLink
4. Manage all milestone events on an Individual basis, i.e„ the team members or <br />subcontractors should not begin a new set of tasks until the milestone for the previous set of <br />tasks has been met and accepted for quality and adherence to the stated project standards. <br />Cast control is synonymous with qualified staff, technical excellence, quality assurance and <br />good project management. For any assignment Coast will use the following: <br />• Qualified, licensed professional surveyors who are In responsible charge of the work, and <br />technical exports whose qualifications are specific to the task. <br />• All work should be carried out under the direct supervision of a locally licensed land <br />surveyor. <br />• State -of- the -art survey equipment, survey software, desktop and notebook computers, <br />communications equipment, and the Internet access for transmittal of data and reports. <br />• Quality control provided at all phases of the work <br />• Hands on survey, mapping, imagining, GIS, modeling and photographic supervision and <br />project management. <br />• Time and cost reporting accounting systems. These costs should be traced on a weekly <br />basis, or on smaller projects back labor costs on a dally basis, <br />• Coordination and communications are equally critical to quality and cost control, <br />• Communications within the team should be conducted on a regular basis in person or via <br />telephone, fax, and /or e -mall, Data files should. be transmitted on a daily basis to the <br />project survey to be reviewed and archived. Client communications should be focused <br />through the survey manager. <br />IN AN EVENT AA ER „LJ 15 OFF SCHEOULIE <br />All the above mentioned elements of QA/QC plan may not guarantee that a project will be on <br />schedule. If the schedule is off schedule, this QAlQC plan will minimize the issues and <br />corrections needed to bring the project back on schedule. <br />Coast Surveying's approach to bring a project back on schedule at no additional cast to the <br />client: <br />1, Early detection <br />2. Early communication to all concerned, including evaluation of corrective measures, <br />which could include; <br />a. Using edditional staff /resources <br />b. Different methods <br />c. Shortening the QA /QC final review time by adding another QA/QC manager, <br />Coast has over the years, developed the project controls, methodology and Implementation <br />methods necessary to give our client the surveying information requested safely, On-Budget <br />and an- Schedule. <br />Q'ChVgLUS ON <br />Coast Surveying, Inc, is especially well suited to perform On -Gall Surveying services for the <br />City of Santa Ana: <br />• Project Manager, Ruel del Castillo, P.L.S. 4212, has over 48 years of surveying <br />experience in Orange County, who has been licensed as a Professional Land Surveyor <br />in California since 1975 and who has extensive experience In all aspects of land <br />surveying, especially construction staking and Corner Records. <br />25E -62 <br />