My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25E - AGMT - CONSTRUCTION SURVEYING SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
04/15/2014
>
25E - AGMT - CONSTRUCTION SURVEYING SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2014 4:05:21 PM
Creation date
4/10/2014 3:20:31 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25E
Date
4/15/2014
Destruction Year
2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit C — Rates <br />CITY OF SANTA ANA <br />REQUEST FOR PROPOSAL FOR <br />CONSTRUCTION SURVEYING SERVICES <br />Certiflcati*n - I certify that I have read, understand and agree to the terms suit conditions of this Request for <br />Proposals. I have examined the Scope of Services (Exhibit A) and am familiar with the scope of work locations. I <br />am familiar with all the existing conditions and limitatkin that may Impact work requests. I understand and ag ree <br />that I am responsible for reporting any errors, ornissions or discrepancies to the City for clarification prior to the <br />submission of my proposal. <br />Proposal Item Price • Pricing shall be based on on hourly cost for services described in Exhibit A. The requi red <br />contract provisions need to include the California State Prevailing Wages (Federal 'Payment of Predetermined <br />Minimum Wage' applies only to federal-aid construction contracts). Prevailing wages will apply to services <br />performed for land surveying, classifications such as chief of party, instrumentman and chainmanlrodman. Fee <br />must be inclusive of all costs, including but not limited to, direct and indirect coats for labor, overhead, incidental <br />supplies, travel, mileage, and fuel. Any special materials will be purchased by the contractor only after discussed <br />and authorized by the City projects manager or designee In willing <br />Now= rt <br />--------------------------- <br />FEDERAL ID NUMBER (IF APPLICABLE)' CONTRACTOK ICENSE NUMBER (IF APPLICABLE) <br />THIS 1`90RRMM MUST 19,CitM1�PLETED AND, <br />PROPOSALS THAT DO NOT CONTA THIS FORM <br />25E-82 <br />
The URL can be used to link to this page
Your browser does not support the video tag.