My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CHRISTENSEN BROTHERS GENERAL ENGINEERING, INC. (2)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
CHRISTENSEN BROTHERS GENERAL ENGINEERING, INC. (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2016 4:18:00 PM
Creation date
4/18/2014 8:03:04 AM
Metadata
Fields
Template:
Contracts
Company Name
CHRISTENSEN BROTHERS GENERAL ENGINEERING, INC.
Contract #
Various
Agency
Public Works
Council Approval Date
4/15/2014
Notes
Project
Document Relationships
CHRISTENSEN BROTHERS GENERAL ENGINEERING, INC. (1)
(Amends)
Path:
\Contracts / Agreements\ PROJECTS\Completed Projects
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REVISED COST ANALYSIS <br />PROJECT NOS. 116743 AND 116415 <br />CONTRACT AWARD FOR BROADWAY REHABILITATION AND BROADWAY <br />AND WASHINGTON AVENUE WATER MAIN IMPROVEMENTS <br />Construction Contract (base) $4,302,858.65 <br />Contingency (Original 10 %) $430,286.00 <br />Added Contingency ( -15 %) Recommended $650,000.00 <br />$5,383,144.65 <br />Contract Administration $172,114.00 <br />Inspection and Testing $129,086.00 <br />Survey $129,086.00 <br />TOTAL ESTIMATED PROJECT DELIVERY COSTS $5,813,430.65 <br />Exhibit 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.