My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LANDSCAPE WEST MANAGEMENT SERVICES, INC. DBA PALO VERDE LANDSCAPE MANAGEMENT COMPANY - 2014
Clerk
>
Contracts / Agreements
>
L
>
LANDSCAPE WEST MANAGEMENT SERVICES, INC. DBA PALO VERDE LANDSCAPE MANAGEMENT COMPANY - 2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2020 9:39:36 AM
Creation date
4/28/2014 10:21:18 AM
Metadata
Fields
Template:
Contracts
Company Name
LANDSCAPE WEST MANAGEMENT SERVICES, INC. DBA PALO VERDE LANDSCAPE MANAGEMENT COMPANY
Contract #
A-2014-014
Agency
PARKS, RECREATION, & COMMUNITY SERVICES
Council Approval Date
1/7/2014
Expiration Date
1/31/2015
Insurance Exp Date
4/1/2015
Destruction Year
2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
161
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5.3.5 Heavy Duty Hose: Used to water down skinned area. Shall be 3/4" to 1" top quality <br />construction with 225 -psi working pressure. Leaks of any kind are not permitted. <br />Contractor shall have a minimum of 175' of hose on hand at all times. <br />5.3.6 High Pressure Nozzle: Attached to hose. Use to spray down brickdust and push excess <br />brickdust off turf edges. <br />5.3.7 Industrial Push Broom: Used to remove excess brickdust from turf edges. Shall be 24" <br />min. wide with heavy -duty dual weight bristles. <br />5.4 Wet Conditions Equipment" (Add to equipment above) <br />During periods of inclement weather or when the areas are wet the contractor shall have "on- <br />hand" during all brickdust maintenance operations the following items: <br />5.4.1 Squeegee: Used to push /squeeze water off wet areas or into dry areas or drains. Shall <br />be 24" to 36" wide with neoprene blade and magnesium /aluminum head. <br />5.4.2 "Super Sopper": Used to collect standing water in brickdust areas. Shall be drum type <br />with exterior sponge and arm holding drum. <br />5.4.3 Diamond or Beckson Pump: Used to remove standing water in brickdust areas. Shall <br />be plastic with flexible piston and value. <br />5.4.4 Infield Sopper with Wringer and Bucket: Used to collect standing water in brickdust <br />areas. Sopper shall be geotextile- covered sponge typical for absorbing chemical spills. <br />6.0 Meetings <br />6.1 Contractor shall provide City of Santa Ana staff with a contact person and a phone number to <br />reach the contact person from the hours of 6:30am — 5:00pm, Monday — Saturday. <br />6.2 Contractor shall appoint and identify to City of Santa Ana staff a "site supervisor ". This site <br />supervisor shall meet with staff as requested at time and place agreed upon by both parties for <br />as long as the contract is in effect to discuss any problems /concerns that may arise and any <br />goals for the week. <br />6.3 In November of each year for as long as the contract is in effect, Contractor shall personally <br />meet with staff, along with the designated site supervisor, to discuss and outline schedules for <br />"Annual Renovations" (listed in Section 10.0). <br />7.0 Daily Infield Maintenance <br />7.1 General <br />7.1.1 Contractor shall remove all litter, broken glass and hazardous debris from infield and <br />dugout areas. <br />7.1.2 Contractor shall keep brickdust and dugout areas in a clean and weed free condition. <br />Dugouts shall be cleaned daily and be free of brickdust, stains, weeds and other debris. <br />Dugouts shall be hosed down weekly so they are completely free of any brickdust or <br />other stains /gum, etc. <br />7.1.3 Contractor shall hose and /or sweep and hose out all dugouts so they are 100% free of <br />Districts 1 and 3 Park Landscape RFP <br />Page 34 <br />
The URL can be used to link to this page
Your browser does not support the video tag.