Laserfiche WebLink
5 YEAR BUDGET MAINTENANCE PLAN <br />The following includes a list of goals and time tables based on the Court Analysis <br />Survey. These timetables can be used in budgeting for short and long term <br />projects. <br />DescHp ion Schedule <br />Laser Grading Laser grading should be considered every Every 10-15 <br />& 111 lift 10-15 years. years <br />T-pdressing is necessary for each annual Annually <br />opening, 1-2 tons of Har-Tru pet, court <br />should be applied with each top-dress. <br />Line 'rape <br />Line Tapes should be pulled up prior to top <br />Annually <br />replacement <br />dressing. This will ensure that lines are <br />straight, tight and have no surface material <br />buildup on either side of line tapes during <br />the pla�yiqj season. <br />Windscreens <br />Windscreerib should be replaced every 3 -5 <br />Now <br />years or as they start to fade, discolor and <br />& <br />_gc�t brittle, <br />3-5 year <br />Fencing-Hard <br />Fencing should be painted or replaced as <br />As Needed <br />Courts <br />needed, Keeping this project in a cycle will <br />help to eliminate a build up of high <br />Tools & I Keeping Brushes and Hand tools in good Drag <br />Equipment I working condition is essential for great Mar Brushes, <br />Tre Courts. Replacing worn brushes, lute Line Masters <br />blades etc. will keep the tools working Lutes <br />property. I Aussie's <br />Having a reliable roller on site will be <br />important to ensure the best possible <br />courts. Preventative maintenance will <br />ensure reliable equipment. <br />Amenities Nets, Net Posts, Coolers, Benches, etc. <br />I should be replaced as needed. <br />48 <br />Grease <br />annually & <br />perform <br />scheduled <br />Preventative <br />Maintenance <br />As Needed <br />