Laserfiche WebLink
c. Revise District 3 Pre- Emergent Agronomic Plan (deleted McFadden Triangle and <br />added Santa Ana Zoo). See attached. <br />4. Attachment 5 Maps has been revised as follows: <br />a. Delete McFadden Triangle Map. <br />b. Add Santa Ana Zoo Map. See attached Santa Ana Zoo map. <br />5. Attachment 9 2013 -2014 Sport/Priority Turf Renovation Schedule has been revised as <br />follows: <br />a. Add 2014 -2015 Sport/Priority Turf Renovation Schedule to Attachment 9. See <br />attached added Attachment 9 2014 -2015 Sport /Priority Turf Renovation Schedule to <br />Attachment 9. <br />6. Exhibit A Scope of Services has been revised as follows: <br />a. Add to II. Grounds /Landscape Maintenance Specifications/ E. Routine Maintenance/ <br />1. Turf Care/ i) Sport/Priority Turf / (1) Renovation the following paragraph: <br />The Contractor shall install a 6' high temporary construction fence, complete with <br />double wide access drive gates, along the perimeter of sport/priority areas. The fence <br />shall be installed on the first day of the of the scheduled renovation period. The City <br />shall provide the Contractor "No Trespassing" signs who will then install the signs on <br />the fence. Should signs be removed or vandalized the Contractor shall immediately <br />replace the signs Prior to the installation of the fence the Contractor shall submit for <br />the City's review a minimum of two competitive bids from fence contractors. Once <br />approved the City shall pay 50% of the total cost of the construction fencing. No <br />mark -ups on the cost of the fencing will be allowed. If during the course of the turf <br />renovation process the fence is damaged/vandalized the City shall pay for the repairs <br />to the fence. <br />7. Exhibit A Scope of Services has been revised as follows: <br />a. Add to IL Grounds /Landscape Maintenance Specifications/ E. Routine Maintenance/ <br />2. Ground Cover Care/ b) Mulching of Bare Areas the following paragraph: <br />Sandpointe Paseos: Instead of mulch, the contractor may elect to cultivate /turn over <br />the soil in these shrub /ground cover areas where mulch would tend to be removed <br />along with the pine needles during regular planter bed maintenance. This shall be <br />done to a depth of 3" once per month. Note that the Taft Street Pasco shall be <br />maintained under the specification including mulch. <br />