Laserfiche WebLink
EXHIBIT C <br />EXHIBIT C: FINAL PROJECT REPORT FORM <br />OCTA <br />Date <br />Instructions <br />The responsible agency should fill out the following: 1) Final Project Form, 2) Final Cost, 3) Certificate of <br />Completion. Page 4, the OCTA Staff Verification will be filled out by OCTA staff. In addition, the agency must <br />attach before (if available) and after photographs of the project site and the address or location of the site under <br />the Location and Scope of work section. <br />Location and Scope of Work <br />Verification of Match <br />Project Schedule <br />Phase? , , <br />,PrQ 'odd <br />:Actual . <br />Draft Environmental Document <br />Final Environmental Document <br />Begin Design Engineering <br />Plans, Specifications, and Cost Estimates complete <br />Start Right-of-Way Acquisition <br />Right-of-Way Certification <br />Ready to Advertise <br />Award Constructon ion <br />Project Completi open for use) <br />Page 1 <br />