Laserfiche WebLink
EXHIBIT C <br />M EXHIBIT C: FINAL PROJECT REPORT FORM <br />Date <br />OCTA <br />Instructions <br />The responsible agency should fill out the following: 1) Final Project Form, 2) Final Cost, 3) Certificate of <br />Completion. Page 4, the OCTA Staff Verification will be filled out by OCTA staff. In addition, the agency must <br />attach before (if available) and after photographs of the project site and the address or location of the site under <br />the Location and Scope of work section. <br />Location and Scope of Work <br />Verification of Match <br />(Actual Expenditures) <br />� � +� �� <br />�� � <br />r(ENTR <br />�°� � � � <br />(E TER <br />{ENTER`O�CTA <br />4 i <br />Other <br />Phase,:z <br />SOU E) <br />SO RGE) ...SOURCE <br />CMJaQ <br />Fundm :. <br />Total <br />Engineering <br />$ <br />$ - <br />$ - <br />$ - <br />$ - <br />$ - <br />Right-of-Way <br />$ <br />$ - <br />$ - <br />$ - <br />$ - <br />$ - <br />Construction <br />$ <br />$ - <br />$ - <br />$ - <br />$ - <br />$ - <br />Total <br />$ <br />$ - <br />$ - <br />$ - <br />$ - <br />$ - <br />Proiect Schedule <br />phase <br />Proposed <br />:. Actual <br />Draft Environmental Document <br />Final Environmental Document <br />Begin Design Engineering <br />Plans, Specifications. and Cost Estimates complete <br />Start Right-of-Way Acquisition <br />Right-of-Way Certification <br />Ready to Advertise <br />Award Construction <br />Project Completion (open for use) <br />Page 1 <br />