My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HONDO COMPANY, INC. (7)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
Completed Projects
>
HONDO COMPANY, INC. (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2024 3:04:20 PM
Creation date
5/5/2014 10:20:26 AM
Metadata
Fields
Template:
Contracts
Company Name
HONDO COMPANY, INC.
Contract #
10-7557
Agency
Public Works
Council Approval Date
10/21/2013
Expiration Date
5/19/2014
Notes
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAYOR <br />Miguel A. Pulido <br />MAYOR PRO TEM <br />Claudia C. Alvarez <br />COUNCILMEMSERS <br />David Benavides <br />Carlos Sustamante <br />Michele Martinez <br />Vincent F. Sarmlento <br />Sal TinaJero <br />August 12, 2013 <br />ADDENDUM No. ONE <br />i <br />A <br />CITY OF SANTA ANA <br />PUBLIC WORKS AGENCY M -36 <br />P.O. Box 1988 <br />Santa Ana, California 92702 <br />SUBJECT: PROJECT No, 10 -7597: Garfield Exercise Park <br />INTERIM CITY MANAGER <br />Paul M. Walters. <br />CITY ATTORNEY <br />Sonia Carvalho <br />CLERK OF THE COUN IL <br />Maria D. Hulzar - , <br />The following changes have been made to the plans and specifications of the subject <br />project: <br />Specifications <br />1. Replace sheet BP -1 with the attached sheet BP -1, <br />2, Add the attached Rubber Tile Surfacing detail as Appendix H, <br />3. Sheet 22, revise Section 2.10 RUBBER TILE SURFACING to read as follows: <br />PART 3: EXECUTION: Preparation: <br />Provide crushed stone /aggregate base for new rubber tile surfacing. Crushed <br />stone /aggregate base shall conform to Section 200, 301 and 400 of the Standard <br />Specifications for Public Works Construction, 2012 Edition, and as described herein: <br />• Apply a homogeneous mixture of fine and medium stone in multiple layers <br />and compact using a mechanical compactor and /or roller to provide an even <br />plane. The crushed stone base must be tightly compacted and smooth, with <br />minimum 1 %slope, <br />Compaction shall be 95 %. <br />Crushed stone base shall be 4" - 6 ", as required <br />M Provide filter fabric. <br />Payment: <br />Payment for Rubber Tile Surfacing shall be paid at the contract unit price listed in the Bid <br />Proposal for Rubber Tile Surfacing and shall include all equipment and materials <br />necessary, including crushed stone base, to install complete and in place for the project as <br />shown on the drawings and specified herein. <br />
The URL can be used to link to this page
Your browser does not support the video tag.