Laserfiche WebLink
Mr. Bill Apple, Associate Planner <br />City of Santa Ana, Planning Division <br />March 11, 2008 <br />Page 13 <br />Signalized <br />(HCM) <br />(ICU) <br />Unsignalized <br />Level of <br />Service <br />Description <br />Delay Range <br />Intersection <br />(HCM) <br />(Sec. per <br />Capacity <br />Reserve Capacity <br />Vehicle <br />Utilization <br />(Vehicle/hour) <br />D <br />Fair operation. Cars are sometimes required to <br />25.1-40.0 <br />.81-.90 <br />100-199 <br />wait more than 60 seconds during short peaks. <br />There are no long-standing traffic queues. This <br />level is typically associated with design practice <br />for peak periods. <br />E <br />Poor operation. Some long-standing vehicular <br />40.1-60.0 <br />.91-1.00 <br />0-99 <br />queues develop on critical approaches to <br />intersections. Delays may be up to several <br />minutes. <br />F <br />Forced flow. Represents jammed conditions. <br />60 <br />Over 1.00 <br />0 <br />Backups from locations downstream or on the <br />cross street may restrict or prevent movement of <br />vehicles out of the intersection approach lanes; <br />therefore, volumes carried are not predictable. <br />Potential for stop and go type traffic flow. <br />URS will provide the City with one (1) electronic copy of the Administrative Draft IS and <br />EIR. URS will also submit 3 hard copies of these documents to the City for review. <br />?. Prepare Mitigation Monitoring Plan <br />URS shall prepare a Mitigation Monitoring Plan (MMP) for the propose project to include all <br />accepted project mitigation measures, indicate the project time period to which the measure <br />applies, the responsible party to implement the measure and the method of monitoring. One <br />electronic copy of the MMP will be sent to the City for review before it is finalized by URS. <br />URS assumes that the MMP will be included as part of the Draft IS/Focused EIR that is sent <br />out for public review. Another option is to include the MMP as part of the Final Focused EIR <br />that is certified by City. <br />4. Finalize and Circulate Initial Study and Notice of Preparation/Proposed EIR <br />This particular task has been divided into the following sub -tasks to meet anticipated noticing <br />and reporting requirements. <br />a. Finalize and Circulate Initial Study / Notice of Preparation <br />Following the City's review and comment on the Administrative Draft IS, URS will revise <br />and incorporate comments as appropriate. Upon finalizing the IS per the City's comments, <br />URS will prepare a Notice of Preparation (NOP) for the City's review — it is anticipated that <br />an Administrative Draft NOP will be submitted to the City with the revised (Final) IS for <br />review. Once finalized, the NOP and IS will be submitted to the State Clearinghouse Office of <br />Planning and Research and other interested parties that have specifically requested a copy of <br />