Laserfiche WebLink
TITLE: ARTERIAL STREETS REHABILITATION PROJECT -SUN FLOWER, SANTA ANA <br />TOTAL 1 $50,794.53 <br />Rounded 1 $51,000.00 <br />2 ,69-- -s <br />RJ NOBLE <br />ITEM <br />BID QUANTITY <br />DESCRIPTION <br />UNIT PRICE <br />AMOUNT <br />1 <br />1 <br />LS <br />MOBILIZATION <br />$34,000.00 <br />$890.00 <br />2 <br />37,125 <br />SF <br />COLD MILL (2" DEPTH) <br />$0.15 <br />$5,568.75 <br />2A <br />10,000 <br />SF <br />Pavement Fabric <br />$0.20 <br />$2,000.00 <br />213 <br />1 <br />LS <br />Time and Material for Repair Grinder <br />$5,177.53 <br />$5,177.53 <br />3 <br />SF <br />COLD MILL (3" DEPTH) <br />$0.15 <br />4 <br />CY <br />Uncl Ex (road only for partial digout up to 8 ") <br />$34.00 <br />5 <br />295 <br />1 TON <br />JASPHALT RUBBER HOT MIX (AHRM) SURFACE COURSE <br />$80.00 <br />$23,617.08 <br />6 <br />127 <br />TON <br />ASPHALT CONCRETE (AC) LEVELING COURSE <br />$78.00 <br />$9,920.14 <br />7 <br />TON <br />6" THICK A.C. BASE COURSE AT VARIOUS LOCATIONS <br />$67.00 <br />8 <br />1 <br />EA <br />ADJUST MANHOLE FRAME AND COVER TO GRADE <br />$550.00 <br />$550.00 <br />9 <br />EA <br />ADJUST WATER VALVE CAN AND COVER TO GRADE <br />$525.00 <br />10 <br />1 <br />FA <br />PROJECT MANAGEMENT <br />$75,000.00 <br />$2,596.00 <br />11 <br />1 <br />LS <br />TRAFFIC CONTROL <br />$18,000.00 <br />$475.00 <br />12 <br />EA <br />IBLUDE "FIRE HYDRANT' RAISED PAVEMENT MARKERS <br />$11.00 <br />13 <br />1 <br />1 LS <br />STRIPING /MARKING <br />$35,000.00 <br />14 <br />1 <br />1 EA <br />JINSTALL TRAFFIC LOOP DETECTORS <br />$200.00 <br />TOTAL 1 $50,794.53 <br />Rounded 1 $51,000.00 <br />2 ,69-- -s <br />