My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - AGMT - ON-CALL SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
06/03/2014
>
25C - AGMT - ON-CALL SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2014 5:30:08 PM
Creation date
5/29/2014 5:25:43 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25C
Date
6/3/2014
Destruction Year
2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agreement Exhibit A <br />City of Santa Ana, PWA <br />IM P— ON -CALL ENGINEERING pESIGN SERVICES FOR WATER AND SEWER MAIN <br />IMPROVEMENTS <br />SAMPLE PROJECT PEE <br />Consultant shall use this Sample Project Fee for the Cost and Price Analysis Comparison and <br />include it along with the comprehensive fee schedule in the sealed fee envelope. This <br />comparison is based upon design engineering services required for approximately one plan of <br />water main improvements and sewer main improvements, including specifications and cost <br />estimate for the following sample project: <br />3,200 L, F. of 8" PVC (AVVWA C -900) water main improvement project for the following limits- <br />0 Rene Drive — Hemlock Way to Segerstrom Avenue <br />• Rita Way — San Lorenzo to Segerstrom Avenue <br />Spruce — San Lorenzo to Segerstrom Avenue <br />• Pacific Ave — San Lorenzo to Segerstrom Avenue <br />• San Lorenzo — Rene Drive to Pacific Avenue <br />4,100 L.F. of 8" PVC (SDR -26) sewer main improvement project for the following limits: <br />o Myrtle Street — Bristol Street to Center Street <br />Provide a detailed scope of work for the tasks required to complete this sample project. City <br />Atlas sheets have been provided to assist with sample project area scope. Assume that a <br />gootechnical investigation is required due to a history of high groundwater in the proposed <br />areas. An environmental determination will also be necessary for this sample project. <br />This Sample Project will be used for FEE and man -hours comparison purposes only. <br />The sample plan to be submitted shall be assumed at 20 scale and shall be the Consultant's <br />closest representation for work related to the Sample Project. The submitted sample plan shall <br />be of a Consultant's previously submitted and approved work. <br />TASK N0.1 TYPICAL SCOPE OF WORK <br />1. Initial Meeting <br />a. Attend project kick -off meeting with City staff to review the project scope, <br />schedule, budget and work plan. Adjust task schedule and work plan as required. <br />b. Review design criteria and parameters. <br />2. Data Gathering <br />a. Obtain available survey records from the City. <br />b. Review existing street, water, sewer, storm drain and utility plans and maps in <br />the possession of the City. Consultant is responsible for the copying of any <br />documents. <br />c. Field review and take photographs that include any impacted adjacent <br />improvements. <br />3. Utility Research <br />A detailed utility search along the proposed alignment will be conducted. It will consist of <br />17 <br />25C -26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.