My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - AGMT - ON-CALL SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
06/03/2014
>
25C - AGMT - ON-CALL SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2014 5:30:08 PM
Creation date
5/29/2014 5:25:43 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25C
Date
6/3/2014
Destruction Year
2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FBF <br />5 a <br />CONSULTING <br />A EM Company <br />March 13, 2014 <br />City of Santa Ana <br />Public Works Agency <br />4`h Floor, Ross Annex <br />20 Civic Center Plaza, Santa Ana, CA 92702 <br />Attn: Mr. Rodolfo Rosas, P.E. <br />Agreement Exhibit B� <br />14725 Alton Parkway <br />Irvine, CA 92618-2027 <br />949.472.3505 <br />94J 472.8373 Fax <br />www.rbf.com <br />www,mbalcercvrp.com <br />Subject: Proposal to Provide On -Call Design Services for Water and Sewer Main Improvements <br />Dear Mr. Rosas: <br />IN 132228 <br />The City of Santa Ana Is committed to serving Its population of 325,000 people with reliable <br />and hlgh - quallty water and sewer service. As part of this commitment, the City desires to select <br />Primary Contact <br />two consultants to provide engineering services on an as- needed basis. The services In general <br />John Nagle, P.E. <br />will consist of water and sewer main replacement design projects on arterial highways, local <br />Project Manager <br />roads and public right of way citywide, The projects also may Include several other related <br />949330.4275,inacle®rMcom <br />services. We would Ilke to emphasize the following benefits the RBF team would bring to the <br />City on this Important project: <br />Responsiveness. The work to be performed under the as- needed contract can be variable, bydisclpline, scope, schedule, and <br />budget. No matter the size or duration of the contract, RBF Is committed to providing the highest level of responsiveness to <br />the City. We will respond and submit on, AIj proposal requests by the time specified by the City. We have assigned one primary <br />point of contact for convenience: John Nagle (Project Manager). <br />Resources, RBF's team Is comprised of water and sewer experts with along history and demonstrated track record of <br />successful water and sewer pipeline designs, as well as design expertise in other facilities such as pump stations, wells, <br />reservoirs, and pressure reducing stations. In addition, RBF also has expert multi- disciplined staff typically needed for water <br />resource projects, Including all In -house Irvine office staff to provide the required services. RBF's management team will <br />provide the City with direct access to this resource of experts who also have In -depth knowledge of local Issues and <br />requirements unique to Orange County. <br />QA /qG It is not the City's job to ensure the work of their as- needed consultant is accurate, complete, and free of errors and <br />omissions, otherwise, the consultant Is only adding to the workload of City staff. RBF Is committed to providing the City with <br />high quality designs and services to ensure the City's customers are being provided the highest quality service, and City staff <br />Isn't spending valuable time checking their consultant's work. With our expansive staff resources, and OA /QC program, the <br />deliverables will meet the highest of City expectations. <br />RBF acknowledges receipt of Addendum Nos. 1, 2, and 3. We appreciate the opportunity to be of continued service to <br />the City of Santa Ana and look forward to discussing how we can assist the City, If you have any questions or need <br />additional information, please contact me at 949.855,3616, cimiller @rbf com or John Nagle at <br />949.330.4275, finagle @rbf.com. <br />Since ay-2 <br />Cindy L. MIIIeIf,,P.E. John Nagle, P.E. <br />Client Services Officer, Water Resources Project Manager, Water Resources <br />Attachments: Proposal (6 copies and 1 CD) <br />Fee Proposal (separately sealed envelope) <br />25C -81 <br />
The URL can be used to link to this page
Your browser does not support the video tag.