My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - AGMT - ON-CALL SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
06/03/2014
>
25C - AGMT - ON-CALL SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2014 5:30:08 PM
Creation date
5/29/2014 5:25:43 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25C
Date
6/3/2014
Destruction Year
2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Firm and Personnel Experience <br />Established in Orange County in 1944, RBF Consulting (RBF), a wholly -owned subsicliary of Michael Baker <br />International, is a multi- dlscipll nary planning, engineering, and construction management firm that offers the City <br />of Santa Ana comprehensive professional engineering services for Its On -Call Professional Engineering Design <br />Services for Water and Sewer Main contract, RBF provides the full range of water resources services from analysis, <br />concept through design, and construction support. The firm employs a professional staff of nearly 200 <br />professionals in the Irvine office with expertise for water and sewer projects, and other related services. <br />Track Record of Ort Call Services <br />Successful delivery of task orders under On -Call Service programs has been a particular strength of the RBF Irvine <br />Water /Wastewater group, The following Is a list of our current on -call contracts that are managed and executed by <br />the RBF Water /Wastewater group. <br />i El Toro Water District <br />a Long Beach Water District <br />4 Castalc Lake Water Agency <br />6 Golden State Water <br />e Santa Clarita Water Division <br />A Mesa Water District <br />• Orange County Sanitation District <br />s Western Municipal Water District <br />Port of Long Beach <br />s Victor Valley Wastewater <br />4 American Water <br />6 City of San Diego <br />♦ Padre Dam Water District <br />Why Select RBF? <br />RBF provides a unique and superior advantage for the city. Key benefits of selecting the RBF team are: <br />1. Proven delivery of on -call services to multiple agencies and municipalities throughout the region; <br />2. Hand - picked team of top engineers and support personnel specializing in water and sewer main design; <br />3. With the exception of geotechnical engineering, we provide ALL services In -house listed In the RFP <br />PROJECT MANAGEMENT TEAM <br />RBF's dedicated management team Includes key professionals from within the firm specifically selected for their <br />experience in the services requested by the District and proven ability to successfully deliver the design of water <br />and sewer pipelines, and related facilities. <br />• Client Services Officer, Cindy Miller, PE, Is a Vice President at RBF with 20 years of experience <br />• Project Manager, John Nagle, PE, is a Vice President at RBF with 26 years of experience <br />• Task Manager, Tori Yokoyama, PE, Is a Project Manager at RBF with 10 years of experience <br />• QA /QC Manager, Kevin Gustorf, PE, is a Vice President at RBF with 15 years of experience <br />If selected for an interview, the RBF team members to attend will be Cindy Miller, John Nagle, and Kevin <br />Gustorf. <br />; <br />ME <br />25C -84 <br />1 <br />.�- CJddyNr.irgr <br />�.�',Ieh�rr�lagte --- =s <br />�9`fQRyo�ama_= <br />Kevin- <br />_GUSiprf <br />If selected for an interview, the RBF team members to attend will be Cindy Miller, John Nagle, and Kevin <br />Gustorf. <br />; <br />ME <br />25C -84 <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.