Laserfiche WebLink
RBF was hired to prepare the POLB Sewer Master Plan and CIP In 2011. The project was completed In 2013 to great <br />acclaim by POLB staff, POLB recommended RBF submit the project for several association awards. In part due to <br />the excellent work provided on the Sewer Master Plan, RBF was awarded an on -call contract with POLE, as one of <br />three firms. RBF has been awarded the first two water /sewer related task orders. The first Is a water system <br />interconnect project that provides looping to the water system at three locations on Pier D. The second project Is a <br />sanitary sewer abandonment on Pier C to properly design the abandonment of <br />Inactive sewer lines previously owned by LBWD, Clty of Long Beach, LACSD, and <br />POLE. RBF has been awarded multiple task orders beyond water /sewer disciplines <br />Including designs and studies for traffic control and transportation related dlscipllnes. <br />Emergency Relocation of 20 -Inch Waterline, Lang Beach, CA. RBF was selected by <br />the Port of Long Beach to provide professional engineering services to prepare design <br />plans for the emergency relocation of a 20 -inch domestic water pipeline. RBF <br />reallocated resources so that Icey staff members could dedicate 100% of their time to <br />prepare design plans to build approximately 2,000 LF of new 20 -Inch waterline in <br />Scenic Harbor Drive. The pipeline was drafted In accordance with the Port's drafting <br />standards and designed to meet the Long Beach Water Department's design <br />standards. REF'S responsiveness, dedication and coordination efforts led to the <br />completion of a design package within four weeks. <br />Client Reference: <br />Mr. Dan Ferons, <br />General Manager <br />949/459 -6590 <br />clanf@smwd.com <br />Santa Margarita Water DlstrIct <br />26111 Antonio Parkway <br />Rancho Santa Margarita, CA <br />Key Staff serving this client: <br />John Nagle Kevin Gustorf <br />sal sheikh Rhonda Tijerina <br />Bill Cox Rlch Beck <br />Emergency relocation of a 20" <br />water pipeline for the POLE <br />Santa Margarita Water District - Middle Chicjuita Canyon Water <br />Facilities <br />RBF is providing preliminary and final design <br />services for approximately 25,000 IS <br />(combined) of domestic and recycled water <br />transmission mains, 4.0 MG of domestic water <br />storage and 4.0 MG of recycled water storage. <br />The first 12,000 LF of pipeline has an <br />accelerated schedule to meet Immediate water <br />delivery needs. The project also includes <br />alternative pipeline alignment analysis for <br />routes through environmentally sensitive areas, <br />grading phasing analysts, and coordination with <br />the Rancho Mission Viejo Company, Orange <br />County Transportation Corridor Agency, and the California Department of Fish and <br />Wildlife. <br />Middle Chiquita Canyon Water Facilities <br />-Site Photo <br />WHAT OUR CLIENTS SAY, <br />Re. City of Anaheim, Citywide sanitary sewer System Repair and Rehabilitation Program /Projects (ph. 111 -Group 1, <br />West Anaheim" "On behalf of the City of Anaheim, I would like to personally thank the RBF team for their excellent <br />support on the Citywide Sanitary Sewer System Repair and Rehabilitation Program (Phase 11I -Group 1, West <br />Anaheim project). Kevin Gustorf, Project Manager, and Tor! Yokoyama, Project Engineer, were instrumental In <br />delivering a high quality set of construction documents within the project schedule. Their dedication and profes- <br />sionalism helped our project move forward smoothly and efficiently. The solutions provided by RBF will significantly <br />improve the reiiability, of the City's gravity sewer collection system which will mitigate the possibility of future sewer <br />spills. Thank you again far your team's continued service to the City of Anaheim." <br />N <br />Khan Chu, P.E, Principal Civil Engineer, City of Anaheim <br />25C -91 <br />