My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - AGMT - ON-CALL SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
06/03/2014
>
25C - AGMT - ON-CALL SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2014 5:30:08 PM
Creation date
5/29/2014 5:25:43 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25C
Date
6/3/2014
Destruction Year
2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RBF was hired to prepare the POLB Sewer Master Plan and CIP In 2011. The project was completed In 2013 to great <br />acclaim by POLB staff, POLB recommended RBF submit the project for several association awards. In part due to <br />the excellent work provided on the Sewer Master Plan, RBF was awarded an on -call contract with POLE, as one of <br />three firms. RBF has been awarded the first two water /sewer related task orders. The first Is a water system <br />interconnect project that provides looping to the water system at three locations on Pier D. The second project Is a <br />sanitary sewer abandonment on Pier C to properly design the abandonment of <br />Inactive sewer lines previously owned by LBWD, Clty of Long Beach, LACSD, and <br />POLE. RBF has been awarded multiple task orders beyond water /sewer disciplines <br />Including designs and studies for traffic control and transportation related dlscipllnes. <br />Emergency Relocation of 20 -Inch Waterline, Lang Beach, CA. RBF was selected by <br />the Port of Long Beach to provide professional engineering services to prepare design <br />plans for the emergency relocation of a 20 -inch domestic water pipeline. RBF <br />reallocated resources so that Icey staff members could dedicate 100% of their time to <br />prepare design plans to build approximately 2,000 LF of new 20 -Inch waterline in <br />Scenic Harbor Drive. The pipeline was drafted In accordance with the Port's drafting <br />standards and designed to meet the Long Beach Water Department's design <br />standards. REF'S responsiveness, dedication and coordination efforts led to the <br />completion of a design package within four weeks. <br />Client Reference: <br />Mr. Dan Ferons, <br />General Manager <br />949/459 -6590 <br />clanf@smwd.com <br />Santa Margarita Water DlstrIct <br />26111 Antonio Parkway <br />Rancho Santa Margarita, CA <br />Key Staff serving this client: <br />John Nagle Kevin Gustorf <br />sal sheikh Rhonda Tijerina <br />Bill Cox Rlch Beck <br />Emergency relocation of a 20" <br />water pipeline for the POLE <br />Santa Margarita Water District - Middle Chicjuita Canyon Water <br />Facilities <br />RBF is providing preliminary and final design <br />services for approximately 25,000 IS <br />(combined) of domestic and recycled water <br />transmission mains, 4.0 MG of domestic water <br />storage and 4.0 MG of recycled water storage. <br />The first 12,000 LF of pipeline has an <br />accelerated schedule to meet Immediate water <br />delivery needs. The project also includes <br />alternative pipeline alignment analysis for <br />routes through environmentally sensitive areas, <br />grading phasing analysts, and coordination with <br />the Rancho Mission Viejo Company, Orange <br />County Transportation Corridor Agency, and the California Department of Fish and <br />Wildlife. <br />Middle Chiquita Canyon Water Facilities <br />-Site Photo <br />WHAT OUR CLIENTS SAY, <br />Re. City of Anaheim, Citywide sanitary sewer System Repair and Rehabilitation Program /Projects (ph. 111 -Group 1, <br />West Anaheim" "On behalf of the City of Anaheim, I would like to personally thank the RBF team for their excellent <br />support on the Citywide Sanitary Sewer System Repair and Rehabilitation Program (Phase 11I -Group 1, West <br />Anaheim project). Kevin Gustorf, Project Manager, and Tor! Yokoyama, Project Engineer, were instrumental In <br />delivering a high quality set of construction documents within the project schedule. Their dedication and profes- <br />sionalism helped our project move forward smoothly and efficiently. The solutions provided by RBF will significantly <br />improve the reiiability, of the City's gravity sewer collection system which will mitigate the possibility of future sewer <br />spills. Thank you again far your team's continued service to the City of Anaheim." <br />N <br />Khan Chu, P.E, Principal Civil Engineer, City of Anaheim <br />25C -91 <br />
The URL can be used to link to this page
Your browser does not support the video tag.