My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BUCKNAM INFRASTRUCTURE GROUP, INC. - 2014
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2020
>
BUCKNAM INFRASTRUCTURE GROUP, INC. - 2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2016 3:43:03 PM
Creation date
6/4/2014 9:46:45 AM
Metadata
Fields
Template:
Contracts
Company Name
BUCKNAM INFRASTRUCTURE GROUP, INC.
Contract #
A-2014-043
Agency
PUBLIC WORKS
Council Approval Date
2/4/2014
Expiration Date
12/31/2014
Insurance Exp Date
9/16/2015
Destruction Year
2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Understanding / Scope of Work - <br />This report will assist the City in complying with OCTA and its most recent Countywide PMP <br />Guideline requirements. The report will be prepared in a format that uses the information <br />delivered by MicroPAVER in conjunction with the information and analysis performed by our <br />team. The report will also provide the City with information on: <br />• Current inventory and pavement conditions indices (PCI) for all road classes <br />• Projected annual rehabilitation programs for street maintenance for a 7 -yr period <br />(ARTERIAL and LOCAL Forecast Maintenance Reports) that show the largest return on <br />investment and acceptable levels of service <br />• Modeling and comparison of budget scenarios typically include: <br />• Maintenance required to complete all streets within 7 -years <br />• Current / Actual budget projection (citywide approach) <br />• 7 -year CIP projection budget for OCTA submittal requirements <br />• Final Local Match Reduction budgetary models / results <br />• Strategies and recommendations for the City's AHRP, Prop. 1B and maintenance <br />programs and procedures, including a preventative maintenance schedule <br />• Supporting documentation required by OCTA <br />• A detailed breakdown of deferred maintenance (backlog) <br />Our OCTA PM submittals have been well received by OCTA and are formatted in such a way for <br />easy review and acceptance. Our staff will include within the draft /final report the following <br />minimum data: <br />A) Average PCI for: <br />a) Entire pavement network <br />b) MPAH Roadways <br />c) Local streets <br />B) Projected PCI under existing funding levels over the next seven years for: <br />a) Entire pavement network <br />b) MPAH Roadways <br />c) Local streets <br />C) Seven -yr plan for road maintenance and rehabilitation, identifying street sections <br />selected for treatment, based on the existing budget. <br />a) Street name, limits of work, length, widths and pavement areas <br />b) Functional classification <br />c) PCI and most recent date of inspection <br />d) Type and cost of treatment <br />D) Alternative funding levels required to: <br />3 -7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.