Laserfiche WebLink
Proposed Fee <br />Proposed Fee <br />Bucknam Infrastructure Group, Inc. has included a time and materials, not -to- exceed fee for the <br />City's consideration (separate envelope). our fee follows the described tasks shown within the <br />Scope of Work. <br />Additionally, we have created specific line item fee summaries to show the projected costs for <br />including the Local and Alley network scope of works within the project. <br />As indicated within our fee, all tasks are negotiable. <br />7 -1 <br />