My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IDMODELING INC. -2014
Clerk
>
Contracts / Agreements
>
I
>
IDMODELING INC. -2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2014 1:44:25 PM
Creation date
6/4/2014 1:35:18 PM
Metadata
Fields
Template:
Contracts
Company Name
IDMODELING INC.
Contract #
A-2014-052
Agency
PUBLIC WORKS
Council Approval Date
2/18/2014
Expiration Date
12/31/2014
Insurance Exp Date
1/6/2015
Destruction Year
2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
s" <br />i <br />• Fire flow requirements — with Input from the City <br />Engineering staff, IDM will develop Fire flow <br />requirements per land use category. This will be <br />used for subsequent fire flow capacity analysis, <br />which will become a factor in pipeline <br />replacement planning. <br />IDM has delivered similar planning services to the <br />following sample set of utility customers: <br />• City of Hesperia -CA <br />• City of Anaheim -CA <br />• Azusa Light & Water -CA <br />• Yorba Linda Water District -CA <br />• Apple Valley Ranchos Water Company -CA <br />Build a Robust Hydraulic Model: This stage <br />of the project represents the actual model <br />construction, inclusive of piping, facilities, and non - <br />hydraulic elements. <br />Pipeline Network Construction: IDM will build the <br />distribution system piping directly from the City's <br />geodatabase and maintain all pipes in the CIS within <br />the model (service later exceptions). All piping will be <br />included as necessary to represent the accurate <br />hydraulic representation and performance of the <br />system and facilities. Following completion of model <br />construction, all distribution system piping will be <br />assigned an initial C- factor based on material, <br />diameter, and typical industry accepted values. These <br />C- factors will be revisited, and revised if necessary, <br />during the C- factor calibration tests. <br />Station and Facility Construction IDM will create all <br />valves, valve stations, pump stations, turnouts, <br />groundwater wells, and tanks with detail and careful <br />attention to model representative schematics which <br />are well organized and easy to follow relative to in- <br />out piping at facilities, especially those which include <br />multiple facility elements such as tanks, groundwater <br />wells, booster and valve stations, <br />Valve stations will include all valves with the station <br />for differing sizes, settings, and possible controls to <br />mimic appropriate responsiveness during calibration <br />towards the operational goals of this model. <br />2. Implementation Plan <br />different in -out piping, sizes, controls, and possibly <br />differing pressure zones within the station. <br />Groundwater wells will be modeled similar to pump <br />stations. <br />Tanks are referenced in the City's geodatabase as <br />points and can be imported and modeled directly, <br />unless there are multiple tanks at a site location <br />which may need to be modeled with more detail. If <br />this is the case, the same methodology mentioned <br />above for facilities will also apply to tanks. <br />Naming Conventions: Unique identifiers will be used <br />for all model elements. Naming conventions for <br />elements will follow "IN" and "OUT" naming <br />conventions for in and out piping. This Is beneficial <br />for 1) performing mass balance for multi - pressure <br />zoned systems, 2) "tagging" SCADA elements for <br />output results comparison against external databases, <br />and 3) ease of reporting and mapping (as the '1N" or <br />"OUT" portion of the ID can be queried and separated <br />from other elements). <br />Quality Assurance Steps: Upon finalizing facility <br />construction, IDM will perform a thorough review of <br />the model via tables, maps, and hydraulic model <br />results (if available) to confirm reasonable input. <br />Bookmarks will be utilized to perform a visual <br />inspection of the completed facilities for ease -of- <br />understanding schematic layouts. Status of this <br />activity will be visited on the bi- weekly conference <br />calls and progress reported via the weekly emai[ <br />updates. <br />Pressure Zone Attribution <br />IDM will utilize the City's hydraulic schematic for the <br />water distribution system and attribute all facilities <br />with its HGL zone designation. <br />Recommendations and Assumptions: <br />a) It is assumed that for zones which have gravity <br />storage, the HGL is represented by the pad <br />elevation of the lowest tanks + maximum water <br />level of that tank. It is assumed that for zones <br />that operate from pumping only, the HGL is <br />represented by the drawdown of the pump + the <br />Pump stations will be developed in a similar fashion TDH of the pump, per latest efficiency tests. <br />as the valves and valve stations, focusing on the <br />necessary detail specific for hydraulic modeling <br />}XIDMODELING@ <br />We can be more, together. <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.