My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-028 - Approving General Plan Amendement No. 2014-01
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2014
>
2014-028 - Approving General Plan Amendement No. 2014-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2014 9:24:38 AM
Creation date
6/11/2014 12:36:01 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2014-028
Date
6/3/2014
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana -Park View at Town and Country Manor <br />Draft EIR Table o f Con tents <br />LIST OF TABLES <br />Table 2 -1: Summary of Environmental Impacts and Mitigation Measures <br />2 -6 <br />Table 3 -1: Description of Cumulative Projects <br />3 -16 <br />Table 42 -1: Local Air Quality ----------------------------------------------------------------------------- ------------------------------4 <br />2 -2 <br />Table 42 -2: Air Pollutants ---------------------------------------------------------------------------------- ------------------------------4 <br />2 -5 <br />Table 42 -3: Regional Significance Thresholds----------------------------------------------------------------------------- <br />-42 -13 <br />Table 424: Construction Emissions-------------------------------------------------------------------- --------------------------42 <br />-14 <br />Table 42 -5: <br />Operational Air Pollutant Emissions ( Summer)--------------------------------------------------------- <br />-42 -15 <br />Table 42 -6: <br />Operational Air Pollutant Emissions ( Winter)------------------------------------------------------------ <br />-42 -15 <br />Table 42 -7: <br />Construction Emissions ( Mitigated)---------------------------------------------------------------------------- <br />4 -2 -17 <br />Table 42 -8: <br />Localized Significance Analysis -------------------------------------------------------------------------------- <br />-42 -18 <br />Table 42 -9: <br />Localized Significance Analysis ( Mitigated) --------------------------------------------------------------- <br />4 -2 -20 <br />Table 42 -10: Carbon Monoxide Concentrations (Opening Year, 2013)---------------------------------------- <br />4 -2 -22 <br />Table 42 -11: <br />Carbon Monoxide Concentrations (General Plan Buildout, 2030)-------------------------- <br />-42 -22 <br />Table 4 -4 -1: <br />General Plan Consistency Analysis ---------------------------------------------------------------------------- <br />-4 -4 -5 <br />Table 4 -5 -1: <br />Noise Levels and Human Response--------------------------------------------------------------------------- <br />-4 -5 -3 <br />Table 4 -5 -2: <br />Vibration Levels and Human Response---------------------------------------------------------------------- <br />-4 -5-4 <br />Table 4 -5 -3: <br />Existing Sensitive Receptors--------------------------------------------------------------------------------------- <br />-4 -5 -6 <br />Table 4 -54: <br />Groundborne Vibration Exposure Standards-------------------------------------------------------------- <br />-4 -5 -7 <br />Table 4 -5 -5: <br />Land Use with Noise Standards---------------------------------------------------------------------------------- <br />-4 -5 -8 <br />Table 4 -5 -6: Vibration Source Amplitudes for Construction Equipment----------------------------------------- <br />4 -5 -14 <br />Table 4 -5 -7: Estimated Construction Vibration Levels (Vibratory Roller)--------------------------------------- <br />4 -5 -15 <br />Table 4 -5 -8: Estimated Construction Vibration Levels (Pile Driver) ----------------------------------------------- <br />4 -5 -16 <br />Table 4 -5 -9: Existing Roadway Noise Levels--------------------------------------------------------------------------------- <br />4 -5 -20 <br />Table 4 -5 -10: Year 2013 Baseline Noise Contours------------------------------------------------------------------------ <br />4 -5 -20 <br />Table 4 -5 -11: Year 2013 With Project Noise Contours ------------------------------------------------------------------ <br />4 -5 -21 <br />Table 4 -5 -12: Year 2030 Baseline Noise Contours------------------------------------------------------------------------ <br />4 -5 -22 <br />Table 4 -5 -13: Year 2030 With Project Noise Contours ------------------------------------------------------------------ <br />4 -5 -23 <br />Table 4 -5 -14: Year 2013 Project Traffic Noise Contributions--------------------------------------------------------- <br />4 -5 -24 <br />Table 4 -5 -15: Year 2030 Project Traffic Noise Contributions--------------------------------------------------------- <br />4 -5 -25 <br />Table 4 -5 -16: Noise Associated with Typical Construction Equipment------------------------------------------ <br />4 -5 -26 <br />Table 4 -5 -17: Estimated Unmitigated Construction Noise Levels at Sensitive Receptors <br />(Scraper) -------------------------------------------------------------------------------- ------------------------------- <br />4 -5 -27 <br />Table 4 -5 -18: Estimated Unmitigated Construction Noise Levels at Sensitive Receptors <br />(Pile Driver)---------------------------------------------------------------------------------- -------------------------4 <br />-5 -28 <br />Table 4 -5 -19: Estimated Mitigated Construction Noise Levels at Sensitive Receptors <br />(Scraper) -------------------------------------------------------------------------------- ------------------------------- <br />4 -5 -30 <br />Michael Brandman Associates v <br />HUi ®t(PN R4)b327b327003MMVB270030 SaW,M TAkofCO t.d. <br />
The URL can be used to link to this page
Your browser does not support the video tag.