My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-028 - Approving General Plan Amendement No. 2014-01
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2014
>
2014-028 - Approving General Plan Amendement No. 2014-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2014 9:24:38 AM
Creation date
6/11/2014 12:36:01 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2014-028
Date
6/3/2014
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CW of Santa Ana -Park View at Town and Country Manor <br />and Traffic Draft EIR <br />Table 4.6.28 (cont.): Summary of Freeway Segment Operation <br />General Plan Buildout (2030) With Project <br />AM Peak Hour I PM Peak Hour <br />Density Density <br />Freeway Segment Lanes (pc/mil (PC/mil Vol. In) LOS Vol. In) LOS <br />Notes: <br />Density is expressed in terms of passenger cars per lane mile in the weaving section. <br />The freeway segment LOS criteria is based on Exhibits 23 -2 and 23 -3 in the Highway Capacity Manual 2000. <br />Source: Traffic Impact Study and Parking Analysis for the Park View at Town & Country Manor, Kimley -Horn <br />Associates, Inc., June 2009. <br />Level of Significance Before Mitigation <br />Less than significant. <br />Mitigation Measures <br />No mitigation measures required. <br />Level of Significance After Mitigation <br />Less than significant. <br />General Plan Buildout (2030) - Ramp Queuing <br />Impact 4.6 -7 The project would not have a significant impact on ramp operation during General <br />Plan (2030) Buildout conditions. <br />Impact Analysis <br />General Plan (2030) Buildout Without the Project - Ramp Queuing Analysis <br />General Plan Buildout peak hour ramp queuing analysis results are summarized in Table 4.6 -29. <br />Table 4.6 -29 indicates that in the Without Project condition, the peak hour queue length at the SR -22 <br />eastbound off -ramp at Town & Country Road will exceed the available queue distance. The queue <br />lengths at all other off -ramps analyzed would continue to be within the available queue distances on <br />each off -ramp. <br />Table 4.6.29: Summary of Peak Hour Ramp Queuing General <br />Plan Buildout (2030) Without Project <br />8501 Percentile <br />Available Queue Length <br />Queue (ft) <br />Distance (ft) pM PM <br />1,300 292 315 <br />1,300 1,953 657 <br />4.6 -36 Michael Brandman Associates <br />H\Cl t(PN- Rnb327b32]0030DERi 3270030 Sec0 Tmspo md¢ <br />
The URL can be used to link to this page
Your browser does not support the video tag.